Navigate / EASA

GM1 SKPI — General

Regulation (EU) 2019/317

A.      Purpose

This Annex contains the supporting material for measuring the safety key performance indicator (SKPI) and safety performance indicators (SPIs) in accordance with Commission Implementing Regulation (EU) 2019/317[37] (the performance and charging scheme Regulation) for the Third Reference Period (RP3).

B.      Objective

The objective of this Annex is to establish the method for the measurement and verification of the SKPI and SPIs under the performance scheme Regulation:

(a)      Effectiveness of safety management (EoSM) by ANSPs, which should be measured through a periodic answering of the questionnaires whose content is provided in the Appendix to AMC2 SKPI, GM3 SKPI and GM4 SKPI. The questionnaires, as completed by the ANSP subject to evaluation, and distributed in accordance with the performance and charging scheme Regulation, should be verified as detailed in AMC2 SKPI and GM4 SKPI;

(b)     Monitoring of separation minima infringement and runway incursion occurrence rates, which should be measured as detailed in AMC3 SPI and GM5 SPI;

(c)      Monitoring of the use of automatic safety data recording systems for monitoring and recording of separation minima infringements and runway incursions by the ANSPs, which should be measured as detailed in AMC4 SPI and GM6 SPI; and

(d)     Monitoring of the air traffic flow management (ATFM) over-deliveries, which should be measured as detailed in AMC5 SPI and GM7 SPI.

C.      Definitions and acronyms

Definitions

—          ‘Best (good) practice’ is a method, initiative, process, approach, technique or activity that is believed to be more effective at delivering a particular outcome than other means. It implies accumulating and applying knowledge about what is working and what is not working, including lessons learned and the continuing process of learning, feedback, reflection and analysis.

—          ‘Risk’ refers to safety risk and means the combination of the overall probability or frequency of occurrence of a harmful effect induced by a hazard and the severity of that effect.

—          ‘Safety culture’ means the shared beliefs, assumptions and values of an organisation and is part of the organisational culture.

 

Acronyms

ACC

 

area control centre

AMC

acceptable means of compliance

ANS

air navigation service

ANSP

air navigation service provider

APP

approach control unit

ATC

air traffic control

ATCO

air traffic control officer

ATFM

air traffic flow management

ATM

air traffic management

ATS

air traffic services

ECCAIRS

European Coordination Centre for Accident and Incident Reporting Systems

ECR

European Central Repository

EoSM

effectiveness of safety management

ERCS

European Risk Classification Scheme

FAB

functional airspace block

IFR

instrument flight rules

GM

guidance material

KPI

key performance indicator

MO

management objective

MS

Member State

MTCD

medium-term conflict detection

NSA

national supervisory authority

NSA Coordination Platform

NCP

Operational Risk Baseline

It relates to the top safety objective of an organisation “to ensure that its contribution to the risk of aircraft accidents is minimised as far as is reasonably practicable” (from IR (EU) 2017/373 ATS.OR.200 (2) (iii)).

PRB

Performance Review Body

RAT

risk analysis tool

RI

runway incursion

Risk control framework

The combination of all reactive, proactive and predictive measures and actions within the ANSP to collectively and continuously manage identified risks/hazards. (from IR (EU) 2017/373 ATS.OR.200 (2))

RP

reference period

RMZ

radio mandatory zone

SA

study area

Safe Production

Decision making that occurs in any part of the organisation that considers the effects that the decision may have on safety, including the resulting reallocation of resources to or from safety.

SKPI

safety key performance indicator

SLA

service level agreement

SMI

separation minima infringement

SMS

safety management system

SPI

safety performance indicator

TMA

terminal manoeuvring area

TMZ

transponder mandatory zone

TWR

tower control unit

UAC

upper area control centre

VFR

visual flight rules

 


[37]    Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU) No 391/2013 (OJ L 56, 25.2.2019, p. 1) (https://eur-lex.europa.eu/legal-content/EN/TXT/?qid=1566812543741&uri=CELEX:32019R0317).