M25.4 Airworthiness limitations and procedures
ED
Decision 2009/010/R
The FRM
shall be subject to analysis using conventional processes and methodology to
ensure that the minimum scheduled maintenance tasks required for securing the
continuing airworthiness of the system and installation are identified and
published as part of the CS 25.1529 compliance. Maintenance tasks
arising from either the Monte Carlo analysis or a CS 25.1309
safety assessment shall be dealt with in accordance with the principles laid
down in AMC 25.1309.
(a) If FRM is used to comply with paragraph M25.1,
Airworthiness Limitations must be identified for all maintenance or inspection
tasks required to identify failures of components within the FRM that are
needed to meet paragraph M25.1.
(b) Maintenance procedures must be developed
to identify any hazards to be considered during maintenance of the fuel system
and of the FRM. These procedures must be included in the instructions for
continued airworthiness (ICA).
[Amdt
25/6]
Loading collections...