AMC 25.1093(b) Power plant icing
ED Decision 2016/010/R
Compliance with CS 25.1093(b) is
required even if certification for flight in icing conditions is not sought.
Applicants must, therefore, propose acceptable means of compliance which may
include flight tests in natural icing conditions.
The results of tests and analysis used for compliance with
CS-E 780 may be used to support compliance with CS 25.1093(b). This
requires close coordination between the engine manufacturer and the aeroplane
manufacturer to make sure that CS-E 780 tests cover all potential ice sources.
If an applicant can show that the ice protection and the ice ingestion
capability of a powerplant is equivalent to a previously certified powerplant
installation which has demonstrated a safe in-service experience, then certification
may be shown by similarity to previous designs. Other airframe ice shedding
sources should also be reviewed if necessary.
(a) Compliance
with CS 25.1093(b)(1)
Compliance with CS 25.1093(b)(1) can be shown by
analysis, laboratory testing, ground testing, dry air flight testing,
similarity, and/or natural icing flight testing as necessary.
As a general rule, engine air intake systems, including auxiliary
components (e.g. scoops, oil coolers, struts, fairings…), should be shown to
operate continuously in icing conditions without regard to time, as in a hold
condition. An exception would be for low engine power/thrust conditions where
a sustained level flight is not possible. Even then, a conservative approach
must be used when a series of multiple horizontal and vertical cloud extent
factors are assumed. Applicants are reminded that the cloud horizontal extent
factor is not intended to be used to limit the severity of exposure to icing
conditions where it is reasonable to assume that the aircraft will be required
to operate in that condition. The applicant will show by analysis, and verify
by test, that the engine air intake Ice Protection System (IPS) provides
adequate protection under all flight operations.
If there is a minimum power/thrust required for descent to ensure
satisfactory operation in icing conditions, the increase to that minimum
power/thrust in icing conditions should be automatic when the IPS is switched
on. The engine may revert back to normal flight idle for short term operation,
such as on final approach to landing; in such a case, this reversion to normal
flight idle should be assessed in term of engine ice ingestion, and any
required operational time limitation or pilot action should be included in the
AFM.
1. Analysis
& Test Point Selection.
Applicants will adequately analyse the engine air intake IPS
performance and address potential ingestion hazards to the engine from any
predicted ice build-up on the engine air intake, including any runback or lip
ice.
In establishing compliance with the requirements of CS 25.1093(b)(1),
reference should be made to AMC
25.1419 paragraph (a) for the assessment of the CS-25 Appendix C icing environment.
In particular for the following aspects:
—
Analytical Simulation Methods;
—
Analysis of areas and components to be protected;
—
Impingement Limit Analysis;
—
Ice Shedding Analysis;
—
Thermal Analysis and Runback Ice; and
—
Similarity Analysis.
In establishing compliance with the requirements of CS 25.1093(b)(1),
reference should be made to AMC
25.1420 paragraph (d) for the assessment of the Appendix O icing environment
in particular for the following aspects:
—
Analysis of areas and components to be protected;
—
Failure analysis, and
—
Similarity analysis.
In addition, the following specific analysis should be conducted:
1.1 Critical
Points Analysis (CPA)
A Critical Points Analysis (CPA) is one analytical approach to identify
the most critical operational icing conditions to show that an engine air
intake system, including auxiliary components (e.g. scoops, oil-coolers,
struts, fairings…), complies with CS 25.1093(b)(1).
For Appendix C icing
conditions, in lieu of a detailed CPA, the conditions specified in paragraph
2.1, “Icing wind tunnel tests”, are acceptable and can be used for testing
without further justification.
The CPA provides a means to predict critical conditions to be assessed
and allows for a selection of conditions which will ensure that the ice
protection system will be adequate throughout the combined aircraft
operation/icing envelope.
The CPA should include ice accretion calculations that account for
freezing fraction and aerodynamic effects of the ice as it moves into the air
intake, forward aircraft airspeed effects, engine configuration effects and
altitude effects such as bypass ratio effects. It should also include
prolonged flight operation in icing (for example, in-flight hold pattern), or
repeated icing encounters.
The CPA should consider:
1. the
aircraft/engine operating envelope. This should consider climb, cruise, hold
and flight idle descent conditions in the icing envelopes.
2. the
environmental icing envelopes defined in CS-25 Appendices C, O and P. The
Intermittent Maximum Icing Conditions of Appendix C envelope extension down to
−40°C should also be considered.
3. thermal
behavior of the ice protection system in icing conditions. For each icing
condition a heat balance can be made to assess the material temperature and
runback water/ice accretion in icing conditions. This balance considers the
heat available from the de-icing/anti-icing system and the heat lost to the
impinging liquid water and external convection. The result determines the need
to undertake an icing test at that point.
Applicants should determine the critical ice accretion conditions and
compare each of them individually with the amount of ice the engine has
satisfactorily demonstrated to ingest during engine certification (CS-E 780).
Applicants may assume that 1/3 of the ice on the air intake perimeter is
ingested as one piece. This assumption is consistent with the historical
approach taken by the engine manufacturers.
The critical ice accretion including runback ice (if any) may be
different for each flight phases. If this is the case, the engine manufacturer
should provide the relevant information. A particular attention should be made
to:
—
ice accretion occurring during the holding phase,
which may be ingested during descent at Idle power/thrust (potentially
critical for engine performance and handling characteristics) or
—
ice accretion occurring during the descent at Idle
power/thrust (with potentially reduced ice protection availability), which may
be ingested during a Go Around at Take-Off power/thrust (potentially critical
for mechanical damage).
Airspeed and scoop factor should be part of this assessment.
Applicants should demonstrate that the full flight envelope and the
full range of atmospheric icing conditions specified in Appendices C, O and P
to CS-25 have been considered, including the mean effective drop / particle
diameter, liquid / total water content, and temperature appropriate to the
flight conditions (for example, configuration, speed, angle-of-attack, and
altitude).
To demonstrate unlimited operation of an air intake system in icing
conditions, the system should:
—
either operate fully evaporative, or
—
any ice accretion, including runback ice, which
forms should result in less ice than the engine has been demonstrated to
ingest per CS-E 780.
The test duration may be reduced if a repeatable build and shed cycle
is demonstrated.
It has been historically shown that an air intake thermal IPS designed
to be evaporative for the critical points in Appendix C continuous maximum
icing conditions, and running wet in Appendix
C intermittent maximum icing conditions, provides satisfactory
performance. If the air intake is running wet in continuous maximum icing
conditions, then the applicant should calculate the amount of runback ice that
would accumulate during any relevant flight phase and compare that to the
maximum certified ingestion capability of the engine per CS-E 780.
Scenario to be considered:
The applicant should justify the icing scenarios to be considered when
determining the critical ice accretion conditions. The flight phases as
defined in Part II of Appendix
C and Part II of Appendix
O could be used to support the justification.
For holding ice accretion, the applicant should determine the effect of
a 45-minute holding in continuous maximum icing conditions of Appendix C. The analysis
should assume that the aeroplane remains in a rectangular “race track”
pattern, with all turns being made within the icing cloud. Therefore, no
horizontal extent correction should be used for this analysis.
If ETOPS certification is desired, the applicant should consider the
maximum ETOPS diversion scenarios.
1.2 Two
Minutes Delayed Selection of Air intake IPS Accretion Analysis
It should be demonstrated that the ice accretion is acceptable after a
representative delay in the selection of the ice protection systems, such as
might occur during inadvertent entry into the conditions. In lack of other
evidence, a delay of two minutes to switch on the IPS should be assumed. For
thermal IPS, the time for the IPS to warm up should be added.
Applicants should calculate the amount of air intake lip ice that forms
using a continuous maximum condition from Appendix C to CS-25, with a
liquid water content factor of one. Of the total lip ice, only the ice on the
inner barrel side of the stagnation point would be ingested into the engine.
Applicants may assume that 1/3 of the ice on the air intake perimeter is
ingested as one piece.
1.3 Ice
accretion sources
Examples of airframe sources of ice accretion include the radome, the
spinner, the antenna and the inboard section of the wing for aft fuselage
mounted engines.
Clear ice may also occur on the wing upper surfaces when cold-soaked
fuel (due to aircraft prolonged operation at high altitude) is in contact with
the fuel tanks’ upper surfaces, or cold soaked structural part is in contact
with upper surfaces, and the aeroplane is exposed to conditions of atmospheric
moisture (for example, fog, precipitation, and condensation of humid air) at
ambient temperatures above freezing. This atmospheric moisture, when in
contact with cold wing surfaces, may freeze. Simultaneous ice shedding from
both wings of an aeroplane may damage surrounding components or structure
parts and result in ice ingestion damage and power/thrust loss in all engines
during take-off of flight for aeroplanes with aft fuselage mounted engines.
Identification of Engine Air intake ice accretion sources includes, for
Appendix O to CS-25 icing environment, an assessment of air intake differing
impingement limits, catch efficiency, distribution effects, and water
contents. The applicant should evaluate the potential ice accumulation aft of
the engine air intake protected surfaces for the possibility of ice ingestion
by the engine.
The applicant should assess the ice accumulations and compare them on
the basis of the size or the kinetic energy of the ice slab. It is possible to
show that ice accumulations are smaller in size and therefore have equal or
less kinetic energy than the CS-E 780 ice ingestion demonstration.
Alternatively, kinetic energy may be used as an acceptable method for
comparing the airframe ice source to the results of the CS-E 780 ice ingestion
demonstration. Any kinetic energy method must be agreed to by the Agency.
1.4 Ice
Detection
1.4.1 Upper
wing mounted ice detection systems
For aircraft with aft fuselage mounted engines equipped with upper wing
mounted ice detection systems to warn the flight crew of clear ice build-up on
the upper surface of the wings, applicants should demonstrate that any
undetected ice, including ice formed from cold-soaked fuel, is not greater
than the ice ingestion demonstrated for CS-E 780 compliance.
1.4.2 Primary
Ice Detection System (PIDS).
The relevant provisions of the AMC 25.1419
paragraph (d) apply.
In addition, if a detection threshold exists in the PIDS (in terms of
Liquid Water Content (LWC), amount of ice accretion, etc…) it must be
demonstrated that the ice accretion that will occur before the actual
detection threshold is reached is consistent with CS-E 780 ice ingestion
demonstration. Prolonged exposure (up to a 45-minute holding configuration in
continuous maximum condition from Appendix C to CS-25) shall be considered at
the limit of the detection threshold to evaluate a conservative amount of ice
accretion.
For aft fuselage mounted engines, both the engine air intake and the
part of the wing in front of the engines should be considered. A conservative
assumption is that the ice accretion may detach from both sites simultaneously
and be ingested by the engines when the IPS is switched on.
1.5 Appendix
P Icing Environment and Pitot-style air intakes design
The results of FAA aerofoil testing in a mixed phase icing environment
indicate that these icing conditions do not appreciably accrete on unheated
aircraft wings. Furthermore the testing showed that exposure to mixed phase
environment results in the same or less ice accretion than exposure to
supercooled liquid water environment with the same Total Water
Content (TWC). The overall power required by the running-wet ice
protection system was essentially unchanged between all-liquid and mixed-phase
conditions.
However, in the running-wet mode, the local power density was much
higher around the stagnation area in the mixed-phase conditions, compared to
the purely liquid conditions. This is due to the power required to offset the
thermodynamic heat-of-fusion necessary to melt the impacting ice particles
that either fully or partially stick to the surface.
This may also explain why Pitot-style air intakes have not proved to be
susceptible to mixed phase ice accretion within the air intake, and why Appendix C to CS-25
compliance methods adequately address those air intakes. Engines designed with
reverse flow air intakes, or with air intakes involving considerable changes
in airflow direction should be shown to comply with Appendix P to CS 25.
Compliance for Pitot-style air intakes, without considerable changes in
airflow direction, may be shown through qualitative analysis of the design and
supported by similarity to previous designs that have shown successful service
histories.
1.6 Falling
and Blowing Snow
1.6.1 CS
25.1093(b)(1) requires that each engine, with all icing protection systems
operating, operate satisfactorily in falling and blowing snow throughout the
flight power/thrust range, and ground idle. Falling and blowing snow is a
weather condition which needs to be considered for the powerplants and
essential Auxiliary Power Units (APUs) of transport category aeroplanes.
1.6.2 All
engine air intakes, including those with plenum chambers, screens,
particle-separators, variable geometry, or any other feature, such as an
oil-cooler, struts or fairings, which may provide a potential accumulation
site for snow, should be evaluated.
1.6.3 Although
snow conditions can be encountered on the ground or in flight, there is little
evidence that snow can cause adverse effects in flight on turbojet and
turbofan engines with traditional Pitot style air intakes where protection
against icing conditions is provided. However, service history has shown that
inflight snow (and mixed phase) conditions have caused power interruptions on
some turbine engines and APUs with air intakes that incorporate plenum
chambers, reverse flow, or particle separating design features.
1.6.4 For
turbojet and turbofan engines with traditional Pitot (straight duct) type air
intakes, icing conditions are generally regarded as a more critical case than
falling and blowing snow. For these types of air intake, compliance with the
icing specifications (at least including the icing environment of Appendix C
to CS-25) will be accepted in lieu of any specific snow testing or analysis.
1.6.5 For
non-Pitot type air intakes, demonstration of compliance with the falling and
blowing snow specification on ground should be conducted by tests and/or
analysis. If acceptable powerplant operation can be shown in the
following conditions, no take-off restriction on the operation of the
aeroplane in snow will be necessary.
a. Visibility:
0.4 Km or less as limited by snow, provided this low visibility is only due to
falling snow (i.e. no fog). This condition corresponds approximately to 1
g/m3.
b. Temperatures:
− 3 °C to + 2 °C for wet (sticky) snow and
– 9 °C to – 2 °C for dry snow, unless other temperatures
are found to be critical (e.g. where dry snow at a lower temperature could
cause runback ice where it contacts a heated surface).
c. Blowing
snow: Where tests are conducted, the effects of blowing snow may be simulated
by taxiing the aircraft at 15 to 25 kts, or by using another aircraft to blow
snow over the test powerplant. This condition corresponds approximately to
3 g/m3.
d. Duration:
It must be shown that there is no accumulation of snow or slush in the engine,
air intake system or on airframe components, which would adversely affect
engine operation during any intended ground operation. Compliance evidence
should consider a duration which corresponds to the achievement of a steady
state condition of accretion and (possible) shedding. Any snow shedding should
be acceptable to the engine.
e. Operation:
The methods for evaluating the effects of snow on the powerplant should be
agreed by the Agency. All types of operation likely to be used on the ground
should be considered for the test (or analysis). This should include prolonged
idling and power transients consistent with taxiing and other ground
manoeuvring conditions. Where any accumulation does occur, the engine should
be run up to full power, to simulate take-off conditions and demonstrate that
no hazardous shedding of snow or slush occurs. Adequate means should be used
to determine the presence of any hazardous snow accumulation.
f. Snow
concentration corresponding to the visibility prescribed is often extremely
difficult to locate naturally and it is often difficult to maintain the
desired concentrations for the duration of testing. Because of this, it is
likely that exact target test conditions will not be achieved for all possible
test conditions. Reasonable engineering judgment should be used in accepting
critical test conditions and alternate approaches, with early coordination
between the applicant and the Agency addressing these realities.
1.6.6 For
in-flight snow (and mixed phase) conditions, some non-Pitot type air intakes
with reverse flow particle separators have been found to accumulate snow/ice
in the pocket lip (sometimes referred to as the “bird catcher” section) just
below the splitter which divides the engine compressor from the air intake
bypass duct. Eventually, the build-up of snow in the pocket (which can melt
and refreeze into ice) either spans across to the compressor air intake side
of the splitter lip or, the snow/ice build-up is released from the pocket and
breaks up whereupon some of the ice pieces can be re-ingested into the
compressor side of the inlet. The ingestion of this snow/ice has caused
momentary or permanent flameouts and in some cases, foreign object damage to
the compressor.
Some aeroplane manufacturers have tried to correct this condition by
increasing the amount and/or frequency of applied thermal heat used around the
pocket, splitter, and bypass sections of the air intake. However, short of
modifying the engine ice protection systems to the point of operating fully
evaporative, these fixes have mostly failed to achieve acceptable results.
1.6.7 Aeroplanes
with turbine engine or essential APU air intakes which have plenum chambers,
screens, particle separators, variable geometry, or any other feature (such as
an oil cooler) which may provide a hazardous accumulation site for snow should
be qualitatively evaluated for in-flight snow conditions. The qualitative
assessment should include:
1) A visual
review of the installed engine and air intake (or drawings) to identify
potential snow accumulation sites,
2) A review
of the engine and engine air intake ice protection systems to determine if the
systems were designed to run wet, fully evaporative, or to de-ice during icing
conditions, and
3) Unless
the air intake ice protection means (e.g. thermal blanket, compressor bleed
air, hot oil) operates in a fully evaporative state in and around potential
air intake accumulation sites, inlet designs with reverse flow pockets exposed
directly to in-flight snow ingestion should be avoided.
Flight testing may be necessary to validate the qualitative assessment.
2. Testing
The engine air intakes may be tested with the engine and propeller
where appropriate in accordance with the specifications of CS-E 780 and AMC E
780.
Where the air intake is assessed separately (e.g. icing wind tunnel
evaluation of IPS performance, lack of suitable test facilities for engine and
air intake, change in the design of the air intake, air intake different from
one tested with the engine), it should be shown that the effects of air intake
icing would not invalidate the engine tests of CS-E.
Factors to be considered in such evaluations are:
—
distortion of the airflow and partial blockage of
the air intakes,
—
the shedding into the engine of air intakes ice of
a size greater than the engine has been shown to ingest per CS-E 780,
—
the icing of any engine sensing devices, other
subsidiary air intakes or equipment contained within the air intake, and
—
the time required to bring the protective system
into full operation.
In establishing compliance with the requirements of CS 25.1093(b)(1),
reference should be made to AMC
25.1419, paragraph (b), for the assessment of the Appendix C icing
environment. In conjunction with the CPA, a thorough validation of the IPS may
include in particular the following aspects:
—
flight tests in dry air with ice protection
equipment operating,
—
flight tests in icing conditions, natural or
artificial, and
—
ground tests in icing wind tunnel.
In establishing compliance with the requirements of CS
25.1093(b)(1), reference should be made to AMC 25.1420, paragraph (d), for the
assessment of the Appendix O icing environment.
2.1 Icing
wind tunnel tests
Icing wind tunnels provide the ability to simulate natural icing
conditions in a controlled environment and they have also been used in
particular to evaluate performance of ice protection systems (IPS), such as
pneumatic and thermal systems.
When the tests are conducted in non-altitude conditions, the system
power supply and the external aerodynamic and atmospheric conditions should be
so modified as to represent the required altitude condition as closely as
possible.
Where an altitude facility is available, the altitudes to be
represented should be consistent with the icing scenario considered. The
appropriate inlet incidences or the most critical incidence should be
simulated.
Icing tests may be performed in sea level facilities. In order to
compensate for the altitude effects, consideration is given to the necessary
amendments to the test parameters in order to achieve an adequate evaluation.
Flight conditions may need to be corrected to allow simulation in a
wind tunnel. To achieve this, the location of the stagnation point on the
inlet lip and the amount of water runback at the throat should be maintained
between flight and wind tunnel conditions. Other test parameters, such as
static or total air temperature, may require similitude adjustments to achieve
the best match of icing condition parameters, such as those described in FAA
AC 20-73A.
For each test, the ice protection supply should be representative of
the minimum engine power/thrust for which satisfactory operation in icing
conditions is claimed.
At the conclusion of each test, the applicants should assess the ice
accumulations and compare them with the amount of ice the engine has
satisfactorily demonstrated to ingest during engine certification (CS-E 780).
Test results may be used to validate the CPA in term of ice accretion
prediction.
For the evaluation of the performance of the IPS, either the critical
points determined by a CPA or the conditions defined in Table 1 below may be
used to simulate CS-25 Appendix C
conditions:
Table
1 – Appendix C test conditions
|
Ambient Air Temperature ° C |
Altitude |
Liquid Water Content g/m3 |
Mean Effective Droplet Diameter µm |
||
|
Ft |
m |
(a) Continuous Max |
(b) Intermittent Max |
||
|
− 10 − 20 − 30 |
17 000 20 000 25 000 |
5 182 6 096 7 620 |
0.6 0.3 0.2 |
2.2 1.7 1.0 |
20 |
Note: The conditions of water concentration required by these tests are
somewhat more severe than those implied by the Appendix C to CS-25 so as to
provide margins.
A separate test should be conducted at each temperature condition of
Table 1 above, the test being made up of repetitions of one of the following
cycles:
1) 28 km
(15.1 NM) in the conditions of Table 1, column (a), appropriate to the
temperature, followed by 5 km (2.7 NM) in the conditions of Table 1, column
(b), appropriate to the temperature, for a total duration of 30 minutes, or
2) 6 km
(3.2 NM) in the conditions of Table 1, column (a), appropriate to the
temperature, followed by 5 km (2.7 NM) in the conditions of Table 1, column
(b), appropriate to the temperature, for a total duration of 10 minutes.
Each test should be run at, or should simulate, different engine
power/thrust conditions, including the minimum power/thrust for which
satisfactory operation in icing conditions is claimed.
Flight Idle power/thrust should be assessed against the conditions
defined in Table 1 both for Column (a) and Column (b).
If there is a minimum power/thrust required for descent to ensure
satisfactory operation in icing conditions, the increase to that minimum
power/thrust in icing conditions should be automatic when the IPS is switched
on, and this minimum power/thrust associated with descent in icing conditions
should be assessed against the conditions in Table 1 above.
The test duration expressed above assume that steady state conditions
(ice shedding cycles) are established. If this is not the case, the test
should continue until a maximum duration of 45 minutes when using test 1)
above or 15 minutes when using test 2) above, except for descent where the
test duration may be limited to the time needed to cover an anticipated
descent of 3 000 m.
Where an altitude facility is available, the altitudes to be
represented should be as indicated in Table 1.
2.2 Delayed
activation of the air intake IPS
When the ingestion tests under CS-E 780 do not adequately
represent the particular airframe installation, then the delayed IPS
activation test should be considered, even for aircraft equipped with PIDS to
consider possible manual IPS activation in “degraded” mode.
Either by separate tests, or in combination with those of paragraph 2.1
above, it should be demonstrated that the ice accretion is acceptable after a
representative delay in the selection of the IPS, such as might occur during
inadvertent entry into the conditions. In lack of other evidence, a delay of
two minutes to switch on the IPS should be assumed when exposed to Continuous
Maximum exposure of Appendix C to CS-25. For thermal IPS, the time for the IPS
to warm up should be added.
Similar to the accepted compliance with CS-E 780 ice ingestion tests,
the use of engine auto-ignition and recovery systems are allowed to show
compliance with the delayed activation tests of CS-25, as long as these
automatic systems cannot be easily turned off by the flight crew.
In the case of De-iced air intakes (designed for a cyclic shedding of
ice from the engine air intake into the engine) which incorporate, as part of
their design, an air intake particle-separator that stops the ingestion of ice
into the core of the engine, engine auto-recovery systems should not be a
compensating design feature utilized to minimize the negative effects of an
inadequate particle-separating air intake that is not in full compliance with CS
25.1093.
2.3 Natural
Icing Flight Tests
Natural icing flight tests may also be used to show compliance with CS
25.1093(b)(1).
In this context, natural icing flight tests are intended to demonstrate
that the engine is capable of operating throughout its flight power/thrust
range (including idling), without an adverse effect. This includes the
accumulation of ice on the engine, air intake system components, or airframe
components that would have an adverse effect on the engine operation or cause
a serious loss of power or thrust.
In addition to proving that the engine air intake icing analysis model
is accurate, several other key issues exist, which the natural ice encounter
may address. These include:
—
the adequacy of flight crew procedures when
operation in icing conditions,
—
the acceptability of control indications to the
flight crew as the aeroplane responds to engine fan blade ice shedding during
various conditions,
—
the performance of the engine vibration indication
system, as well as other engine indication systems, and
—
the confirmation that the powerplant installation
performs satisfactorily while in icing conditions. This whole powerplant
installation includes the engine, air intake, and the IPS system.
2.4 Testing
in Non-Representative Conditions
When damage results from icing test conditions that fall significantly outside Appendices C, O and P to CS-25 icing envelopes, or when the aeroplane flight test is conducted in an abnormal manner and results in excessive ice shed damage, this may result in a test failure relative to the pre-test pass or fail criteria. Any abnormal conditions should be discussed with the Agency to determine if the test can be deemed “passed.” An example of an abnormal operation could be flying with one engine at idle while the aircraft is operated in level flight.
3. Comparative Analysis.
For
showing compliance with the CS-25 certification specifications relative to SLD
icing conditions represented by Appendix O, the applicant may use a
comparative analysis. AMC 25.1420(f) provides guidance for comparative
analysis.
(b) Compliance
with CS 25.1093(b)(2)
Ground taxi exposure to Appendices C and O to CS-25
1. Critical
Points Analysis (CPA).
The temperatures should result from a CPA, considering the full range
of temperatures specified in CS 25.1093(b)(2), conducted to
determine the critical ice accretion conditions for the air intake.
2. Ground
taxi exposure to Appendix O
conditions.
The service experience indicates that engine fan damage events exist from exposure to SLD during ground taxi operations. For this reason, an additional condition of a 30-minute, idle power/thrust exposure to SLD on the ground must be addressed. Applicants should include the terminal falling velocity of SLD (for example, freezing rain, freezing drizzle) in their trajectory assessment, relative to the protected sections of the air intake. The 100 micron minimum mean effective diameter (MED) is selected as a reasonably achievable condition, given current technology. To certify by analysis the applicant should evaluate the Appendix O drop sizes up to a maximum of 3 000 microns particle size to find a critical condition.
For showing compliance with the CS-25 certification
specifications relative to SLD icing conditions represented by Appendix O, the
applicant may use a comparative analysis. AMC 25.1420(f) provides guidance for
comparative analysis.
3. Operating
limitation.
The conditions defined in CS 25.1093(b)(2), in terms of time
and temperature, should be considered as limitations necessary for the safe
operation in freezing fog, and made available to the crew in the Aeroplane
Flight Manual (refer to CS
25.1581).
Nevertheless, the applicant may use an analysis to substantiate safe
operation of the engine at temperatures below the demonstrated minimum
temperature. No limitation would then be required in the Aeroplane Flight
Manual.
[Amdt 25/16]
[Amdt 25/18]
Aircraft engine powerplant installations must prevent hazardous ice accumulation, even without icing certification. Compliance involves analysis, testing, or similarity to proven designs. Engine air intakes need continuous ice protection, considering various icing conditions and potential ice ingestion. Specific analysis, like Critical Points Analysis, is crucial, alongside ground and flight testing.
* Summary by Aviation.Bot - Always consult the original document for the most accurate information.
Loading collections...