Navigate / EASA
GM 21.A.97(b) Requirements for the approval of a major change

ED Decision 2019/018/R

The level of detail of the documents that are referred to in 21.A.93(b) should be the same regardless of whether the change is approved by EASA or under a design organisation approval (DOA) privilege, to allow the change to be assessed in the frame of the DOA surveillance.