Navigate / EASA

CS ACNS.C.PBN.575 RNP system design — integrity in final approach

ED Decision 2019/011/R

(See AMC1 ACNS.C.PBN.575)

The integrity of the vertical guidance provided by the aircraft’s RNP system supports the intended operations.

[Issue: CS-ACNS/2]