Navigate / EASA

AMC1 ACNS.C.PBN.715 RNP scalability

ED Decision 2019/011/R

Installation of equipment with an ETSO authorisation against ETSO-C115d satisfies the requirement.

[References: ED-75D § 3.7.2.1.3.1, ED-75D § 3.2.6, ED-75D § 3.2.6.2]

[Issue: CS-ACNS/2]