AMC1 ACNS.C.PBN.240 Route/procedure extraction and loading
ED Decision 2019/011/R
Installation of equipment with an ETSO authorisation against ETSO-C115d satisfies the requirement.
The installation of equipment with an ETSO authorisation against ETSO-C146c satisfies the CS requirement, provided that the applicant ensures that speed constraints are extracted from the database.
[Reference: ED-75D ยง 3.7.2.1.1.1]
[Issue: CS-ACNS/2]
Loading collections...