AMC No 2 to CS
27.865 External loads
ED
Decision 2018/015/R/R
a. Explanation
(1) This AMC
contains guidance for the certification of helicopter external-load attaching
means and load-carrying systems to be used in conjunction with operating
rules, such as Regulation (EU) No 965/2012 on Air Operations[12]. Also,
paragraph CS 27.25 concerns,
in part, jettisonable external cargo.
(2) CS 27.865 provides a minimum level of safety for small rotorcraft designs to be used with operating rules, such as Regulation (EU) No 965/2012 on Air Operations. Certain aspects of operations, such as microwave tower and high-line wirework, may also be regulated separately by other national rules. For applications that could fall under the scope of applicability of several regulations, special certification emphasis will be required by both the applicant and the approving authority to assure all relevant safety requirements are identified and met. Potential additional requirements, where thought to exist, are noted herein.
(3) The CS
27.865 provisions for external loads do not discern the difference between a
crew member and a compensating passenger when either is carried external to
the rotorcraft. Both are considered to be HEC.
b. Definitions
(1) Backup
quick-release subsystem (BQRS): the secondary or ‘second choice’ subsystem
used to perform a normal or emergency jettison of external cargo.
(2) Cargo:
the part of any rotorcraft-load combination that is removable, changeable, and
is attached to the rotorcraft by an approved means. For certification
purposes, ‘cargo’ applies to HEC and non-human external cargo (NHEC).
(3) Cargo
hook: a hook that can be rated for both HEC and NHEC. It is typically used by
being fixed directly to a designated hard point on the rotorcraft.
(4) Dual
actuation device (DAD): this is a sequential control that requires two
distinct actions in series for actuation. One example is the removal of a lock
pin followed by the activation of a ‘then free’ switch or lever for load
release to occur (in this scenario, a load release switch protected only by an
uncovered switch guard is not acceptable). For jettisonable HEC applications,
a simple, covered switch does not qualify as a DAD. Familiarity with covered
switches allows the pilot to both open and activate the switch in one motion.
This has led to inadvertent load release.
(5) Emergency
jettison (or complete load release): the intentional, instantaneous release of
NHEC or HEC in a preset sequence by the quick-release system (QRS) that is
normally performed to achieve safer aircraft operation in an emergency.
(6) External fixture: a structure external to and in addition to the basic airframe that does not have true jettison capability and has no significant payload capability in addition to its own weight. An example is an agricultural spray boom. These configurations are not approvable as ‘External Loads’ under CS 27.865.
(7) External
Load System. The entire installation related to the carriage of external loads
to include not only the hoist or hook, but also the structural provisions and
release systems. A complex PCDS is also considered to be part of the external
load system.
(8) Hoist: a
hoist is a device that exerts a vertical pull, usually through a cable and
drum system (i.e. a pull that does not typically exceed a 30-degree cone
measured around the z-rotorcraft axis).
(9) Hoist
demonstration cycle (or ‘one cycle’): the complete extension and retraction of
at least 95 % of the actual cable length, or 100 % of the cable
length capable of being used in service (i.e. that would activate any
extension or retraction limiting devices), whichever is greater.
(10) Hoist
load-speed combinations: some hoists are designed so that the extension and
retraction speed slows as the load increases or nears the end of a cable
extension. Other hoist designs maintain a constant speed as the load is
varied. In the latter designs, the load-speed combination simply means the
variation in load at the constant design speed of the hoist.
(11) Human
external cargo (HEC): a person (or persons) who, at some point in the
operation, is (are) carried external to the rotorcraft.
(12) Non-human
external cargo (NHEC): any external cargo operation that does not at any time
involve a person (or persons) carried external to the rotorcraft.
(13) Normal
jettison (or selective load release): the intentional release, normally at
optimum jettison conditions, of NHEC.
(14) Personnel-carrying
device system (PCDS) is a device that has the structural capability and
features needed to transport occupants external to the helicopter during HEC
or helicopter hoist operations. A PCDS includes but is not limited to life
safety harnesses (including, if applicable, a quick-release and strop with a
connector ring), rigid baskets and cages that are either attached to a hoist
or cargo hook or mounted to the rotorcraft airframe.
(15) Primary
quick-release subsystem (PQRS): the primary or ‘first choice’ subsystem used
to perform a normal or emergency jettison of external cargo.
(16) Quick-release
system (QRS): the entire release system for jettisonable external cargo (i.e.
the sum total of both the primary and backup quick-release subsystem). The QRS
consists of all the components including the controls, the release devices,
and everything in between.
(17) Rescue
hook (or hook): a hook that can be rated for both HEC and NHEC. It is
typically used in conjunction with a hoist or equivalent system.
(18) Rotorcraft-load
combination (RLC): the combination of a rotorcraft and an external load,
including the external-load attaching means.
(19) Spider: a spider is a system of attaching a lowering cable or rope or a harness to an NHEC (or HEC) RLC to eliminate undesirable flight dynamics during operations. A spider usually has four or more legs (or load paths) that connect to various points of a PCDS to equalise loading and prevent spinning, twisting, or other undesirable flight dynamics.
(20) True jettison capability: the ability to safely release an external load using an approved QRS in 30 seconds or less.
NOTE: In all cases, a PQRS should release the external load in less
than 5 seconds. Many PQRSs will release the external load in milliseconds,
once the activation device is triggered. However, a manual BQRS, such as a set
of cable cutters, could take as much as 30 seconds to release the external
load. The 30 seconds would be measured starting from the time the release
command was given and ending when the external load was cut loose.
(21) True
payload capability: the ability of an external device or tank to carry a
significant payload in addition to its own weight. If little or no payload can
be carried, the external device or tank is an external fixture (see definition
above).
(22) Winch: a
winch is a device that can employ a cable and drum or other means to exert a
horizontal (i.e. x-rotorcraft axis) pull. However, in designs that
utilise a winch to perform a hoist function by use of a 90-degree cable
direction change device (such as a pulley or pulley system), the winch system
is considered to be a hoist.
c. Procedures
The following certification procedures are provided in the most general
form. Where there are significant differences between the cargo types, these
differences are highlighted.
(1) General
Compliance Procedures for CS
27.865: The applicant should clearly identify the applicable cargo types
(NHEC or HEC) for which an application is being made. The structural
loads and operating envelopes for each applicable cargo type should be
determined and used to formulate the flight manual supplement and basic loads
report. The applicant should show by analysis, test, or both, that the
rotorcraft structure, the external-load attaching means, and the complex PCDS,
if applicable, meet the specific requirements of CS 27.865 and any other
relevant requirements of CS-27 for the proposed operating envelope.
NOTE: the approved maximum internal gross weight should never be exceeded for any approved HEC configuration (or simultaneous NHEC and HEC configuration).
(2)
Reliability of the external load system, including the QRS.
(i) The
hoist, QRS, and rescue hook system should be reliable for all phases of flight
and the applicable configurations for those phases (i.e. operating, stowed, or
unstowed) for which approval is sought. The hoist should be disabled (or an
overriding, fail-safe mechanical safety device such as either a flagged
removableshear pin or a load-lowering brake should be utilised) to
prevent inadvertent load unspooling or release during any extended flight
phases in which hoist operation is not intended. Loss of hoist operational
control should also be considered.
(ii) A failure of
the external load system, (including QRS, hook, complex PCDS where applicable,
and attachments to the rotorcraft) should be shown to be extremely improbable
(i.e. 1 × 10-9 failures per flight) for all failure modes that could cause a
catastrophic failure, serious injury or a fatality anywhere in the total
airborne system. Uncontrolled high-speed descent of the hoist cable would fall
into this category. All significant failure modes of lesser consequence should
be evaluated and shown to be at least improbable (i.e. 1 × 10-5 failures per
flight).
(iii) The
reliability of the system should be demonstrated by completion and approval of
the following:
(A) A
functional hazard assessment (FHA) to determine the hazard severity of failures
associated with the external load system. The effect of the flailing cable
after a load release should be considered.
(B) A fault
tree analysis (FTA) or equivalent to verify that the hazard classification of
the FHA has been met.
(C) A system
safety assessment (SSA) to demonstrate compliance with the applicable
certification requirements.
(D) An
analysis of the non-redundant external load system components that constitute
the primary load path (e.g., beam, cable, hook), to demonstrate compliance
with the applicable structural requirements.
(E) A repetitive test of all functional devices that cycles these devices under critical structural conditions, operational conditions, or a combination of both, at least 10 times each for NHEC and 30 times for HEC. This is applicable to both primary and backup subsystems. It is assumed that only one hoist cycle will typically occur per flight. This rationale has been used to determine the 10 demonstration cycles for NHEC applications and 30 demonstration cycles for HEC applications. However, if a particular application requires more than one hoist cycle per flight, then the number of demonstration cycles should be increased accordingly by multiplying the test cycles by the intended higher cycle number per flight. These repetitive tests may be conducted on the rotorcraft or by using a bench simulation that accurately replicates the rotorcraft installation.
(F) An
environmental qualification for the proposed operating environment. This
review includes consideration of low and high temperatures (typically – 40 °C
(– 40 °F) to + 65.6 °C (+ 150 °F), altitudes to 12 000 feet, humidity, salt
spray, sand and dust, vibration, shock, rain, fungus, and acceleration. The
appropriate rotorcraft sections of RTCA Document DO-160/ EUROCAE ED-14 for
high and low temperature and vibration are considered to be acceptable for
environmental qualification. The environmental qualification will address
icing for those external load systems installed on rotorcraft approved for
flight into icing conditions.
(G) Qualification of the hoist itself to the appropriate electromagnetic interference (EMI) and lightning threat levels specified for NHEC or HEC, as applicable. This qualification can occur separately or as part of the entire on-board QRS.
(3) Testing.
(i) Hoist
system load-speed combination ground tests: the load versus-speed combinations
of the hoist should be demonstrated on the ground (either using an accurate
engineering mock-up or a rotorcraft) by showing repeatability of the no
load-speed combination, the 50 per cent load-speed combination, the 75 per
cent load-speed combination, and the 100 per cent (i.e. system rated limit)
load-speed combination. If more than one operational speed range exists, the
preceding tests should be performed at the most critical speed.
(A) At least 1/10 of the hoist demonstration cycles (see definition) should include the maximum aft angular displacement of the load from the vertical, applied for under CS 27.865(a).
(B) A
minimum of six consecutive, complete operation cycles should be conducted at
the system's 100 per cent (i.e. system limit rated) load-speed combination.
(C) In
addition, the demonstration should cover all normal and emergency modes of
intended operation and should include operation of all control devices such as
limit switches, braking devices, and overload sensors in the system.
(D) All
quick disconnect devices and cable cutters should be demonstrated at 0 per
cent, 25 per cent, 50 per cent, 75 per cent, and 100 per cent of system limit
load or at the most critical percentage of limit load.
Note:
some hoist designs have built-in cable tensioning devices that function at the
no load-speed combination, as well as at other load-speed combinations. This
device should work during the no load-speed and other load-speed cable-cutting
combinations.
(E) Any
devices or methods used to increase the mechanical advantage of the hoist
should also be demonstrated.
(F) During a
portion of each demonstration cycle, the hoist should be operated from each
station from which it can be controlled.
(ii) Hoist
and rescue hook systems or cargo hook systems flight test: an in-flight
demonstration test of the hoist system should be conducted for helicopters
designed to carry NHEC or HEC. The rotorcraft should be flown to the extremes
of the applicable manoeuvre flight envelope and to all conditions that are
critical to strength, manoeuvrability, stability, and control, or any other
factor affecting airworthiness. Unless a lesser load is determined to be more
critical for either dynamic stability or other reasons, the maximum hoist
system rated load or, if less, the maximum load requested for approval (and
the associated limit load data placards) should be used for these tests. The
minimum hoist system load (or zero load) should also be demonstrated in these
tests.
(iii) CS
27.865(d) Flight test Verification Work: flight test verification work that
thoroughly examines the operational envelope should be conducted with the
external cargo carriage device for which approval is requested (especially
those that involve HEC). The flight test programme should show that all
aspects of the operations applied for are safe, uncomplicated, and can be
conducted by a qualified flight crew under the most critical service
environment, and, in the case of HEC, under emergency conditions. Flight tests
should be conducted for the simulated representative NHEC and HEC loads to
demonstrate their in-flight handling and separation characteristics. Each
placard, marking, and flight manual supplement should be validated during
flight testing.
(A) General:
flight testing or an equivalent combination of analysis, ground tests, and
flight tests should be conducted under the critical combinations of
configurations and operating conditions for which basic type certification
approval is sought. The critical load condition of the intended cargo (e.g. rocks, lumber, radio towers, HEC) may be defined by a heavy weight and
low area cargo or a low weight and high area cargo. The effects of these load
conditions should be evaluated throughout the operational aspects of cargo
loading, take-off, cruise up to maximum allowable speed with cargo, jettison,
and landing. The helicopter handling with different cable conditions should
include lateral transitions and quick stops up to the helicopter approved low
airspeed limitations. Additional combinations of external load and operating
conditions may be subsequently approved under relevant operational
requirements as long as the structural limits and reliability considerations
of the basic certification approval are not exceeded (i.e. equivalent safety
is maintained). The qualification flight test of this subparagraph is intended
to be accomplished primarily by analysis or bench testing. However, at least
one in-flight, limit load drop test should be conducted for the critical load
case. If one critical load case cannot be clearly identified, then more than
one drop test might be necessary. Also, in-flight tests for the minimum load
case (i.e. typically the cable hook itself) with the load trailing both in the
minimum and maximum cable length configurations should be conducted. Any
safety-of-flight limitations should be documented and placed in the RFM or
RFMS. In certain low-gross weight, jettisonable HEC configurations, the
complex PCDS may act as a trailing aerofoil that could result in entangling
the complex PCDS with the rotorcraft. These configurations should be assessed
on a case-by-case basis by analysis or flight test to ensure that any
safety-of-flight limitations are clearly identified and placed in the RFM or
RFMS (also see PCDS).
(B) Separation
characteristics of jettisonable external loads: for all jettisonable RLCs of
any applicable cargo type, satisfactory post-jettison separation
characteristics of all loads should meet the minimum criteria that follow:
(1) Separate
functioning of the PQRS and BQRS resulting in a complete, immediate release of
the external load without interference by the rotorcraft or external load
system.
(2) No
damage to the helicopter during or following actuation of the QRS and load
jettisoning.
(3) A
jettison trajectory that is clear of the helicopter.
(4) No
inherent instability of the jettisonable (or just jettisoned) HEC or NHEC
while in proximity to the helicopter.
(5) No
adverse or uncontrollable helicopter reactions at the time of jettison.
(6) Stability
and control characteristics after jettison that are within the originally
approved limits.
(7) No adverse degradation on helicopter performance characteristics after jettison.
(C) Jettison
requirements for jettisonable external loads: for representative cargo types
(low, medium, and high-density loads on long and short lines), emergency and
normal jettison procedures should be demonstrated (by a combination of
analysis, ground tests, and flight tests) in sufficient combinations of flight
conditions to establish a jettison envelope that should be placed in the
flight manual.
(D) QRS
demonstration; repetitive jettison demonstrations that use the PQRS, which may
be accomplished during ground or flight tests, should be conducted. The BQRS
should be utilised at least once.
(E) QRS
reliability (i.e. failure modes) affecting flight performance: the FHA of the
QRS (see paragraph c.(2) above) should show that any single system failure
will not result in unsatisfactory flight characteristics, including any QRS
failures resulting in asymmetric loading conditions.
(F) Flight
test weight and CG locations: all flight tests should be conducted at the
extreme or critical combinations of weight and longitudinal and lateral CG
conditions within the applied-for flight envelope. Typically the two load
conditions would be a heavy weight and low area cargo, and a low weight and
high area cargo. The rotorcraft should remain within approved weight and CG
limits, both with the external load applied, and after jettison of the load.
(G) Jettison
Envelopes: emergency and normal jettison demonstrations should be performed at
sufficient airspeeds and descent rates to establish any restrictions for
satisfactory separation characteristics. Both the maximum and minimum airspeed
limits and the maximum descent rate for safe separation should be determined.
The sideslip envelope as a function of airspeed should be determined.
(H) Altitude:
emergency and normal jettison demonstrations should be performed at altitudes
that are consistent with the approvable operational envelope and with the
manoeuvres necessary to overcome any adverse effects of the jettison.
(I) Attitude:
emergency and normal jettison demonstrations should be performed from all
attitudes that are appropriate to normal and emergency operational usage.
Where the attitudes of HEC or NHEC with respect to the helicopter may be
varied, the most critical attitude should be demonstrated. This demonstration
would normally be accomplished by bench testing.
(4) Rotorcraft
Flight Manual (RFM) and Rotorcraft Flight Manual Supplement (RFMS):
(i)
General.
(A) Present
appropriate flight manual procedures and limitations for all HEC operations.
(1) The
approval of an external loads equipment design in accordance with CS 27.865
does not provide an approval to conduct external loads
operations. Therefore, the following should be included as a limitation in the
RFM or RFMS:
—
The external load equipment certification approval
does not constitute an operational approval; an operational approval for
external load operations must be granted by the competent authority.
(2) The RFM
or RFMS that will be approved through the certification activity should not
contain any references to the previously used RLC classes.
(B) For
non-HEC designs, the following limitation should be included within the RFM or
RFMS:
—
The external load system does not comply with the
CS-27 certification provisions for Human External Cargo (HEC).
(C) The RFM
or RFMS may contain suitable text to clarify whether the external load system
meets the applicable certification provisions for lifting an external load
free of land or water, and whether the load is jettisonable.
(D) The RFM
or RFMS should contain emergency procedures detailing the steps to be taken by
the flight crew during emergencies such as an engine failure, hoist failure,
flight director or autopilot failure, etc.
(E) The RFM
or RFMS normal procedures should explain the required procedures to conduct a
safe external load operation. Such information may include the methods for
attachment and normal release of the external load.
(ii) HEC
installations.
(A) For HEC
installations, the following additional information/limitation should be
included in the RFM or RFMS:
(1) That the
external load system meets the CS-27 certification specifications for Human
External Cargo (HEC).
(2) Operation
of the external load equipment with HEC requires the use of an approved
Personnel Carrying Device Systems (PCDS).
NOTE:
for a simple PCDS, also refer to AMC No. 3 to 27.865
(B) Crew
member communications.
(1) The
flight manual should clearly define the method of communication between the
flight crew and the HEC. These instructions and manuals should be validated
during flight testing.
(2) If the
external load system does not include equipment to allow direct
intercommunication among required crew members and external
occupants, the following limitation may be included within the limitations
section of the RFM or RFMS:
—
This external load system does not include
equipment to allow direct intercommunication among required crew members and
external occupants. Operating this external load equipment with HEC is not
authorised unless appropriate equipment to allow direct intercommunication
between required crew members and external occupants has an airworthiness
approval.
(iii) Additional
RFM or RFMS requirements are contained within each applicable paragraph of
this AMC.
(5)
Continued airworthiness.
(i) Instructions
for Continued Airworthiness: maintenance manuals (and RFM supplements)
developed by applicants for external load applications should be presented for
approval and should include all appropriate inspection and maintenance
procedures. The applicant should provide sufficient data and other information
to establish the frequency, extent, and methods of inspection of critical
structure, systems, and components. CS 27.1529 and Appendix A to CS-27
requires this information to be included in the maintenance manual. For
example, maintenance requirements for sensitive QRS squibs should be carefully
determined, documented, approved during certification, and included as
specific mandatory scheduled maintenance requirements that may require either
‘daily’ or ‘pre-flight’ checks (especially for HEC applications).
(ii) Hoist
system continued airworthiness. The design life of the hoist system and any
limited life components should be clearly identified, and the Airworthiness
Limitations Section of the maintenance manual should include these
requirements. For STCs, a maintenance manual supplement should be provided
that includes these requirements.
Note: the design life of a hoist and cable system is typically between 5 000 and 8 000 cycles. Some hoist systems have usage time meters installed. Others may have cycle counters installed. Cycle counters should be considered for HEC operations and high-load or other operations that may cause low-cycle fatigue failures.
(6) CS
27.865(a) Static Structural Substantiation and CS
27.865(f) Fatigue Substantiation Procedures: The following static structural
substantiation methods and fatigue substantiation should be used:
(i) Critical
Basic Load Determination. The critical basic loads and corresponding flight
envelope are determined by statically substantiating the gross weight range
limits, the corresponding vertical limit load factors (NZW) and the
safety factors applicable for the type of external load for which the
application is being made.
NOTE: in cases where NHEC or HEC can have more than one shape, centre of gravity, centre of lift, or be carried at more than one distance in-flight from the rotorcraft attachment, a critical configuration for certification purposes may not be determinable. If such a critical configuration can be determined, it may be examined for approval as a ‘worst case’ to satisfy a particular certification criterion or several criteria, as appropriate. If such a critical configuration cannot be determined, the extreme points of the operational external load configuration envelope should be examined, with consideration given to any other points within the envelope that experience or any other rationale indicates as points that need to be investigated.
(ii) Vertical
Limit and Ultimate Load Factors. The basic NZW is converted to the
ultimate load by multiplying the maximum vertical limit load by the
appropriate safety factor (for restricted category approvals, see the guidance
in paragraph AC 27 MG 5 of FAA AC 27-1B Change
7).
This ultimate load is used to substantiate all the existing structure affected
by, and all the added structure associated with, the load-carrying device, its
attachments and its cargo. Casting factors, fitting factors, and other dynamic
load factors should be applied where appropriate.
(A) NHEC
applications. In most cases, it is acceptable to perform a standard static
analysis to show compliance. A vertical limit load factor (NZW) of
2.5 g is typical for heavy gross weight NHEC hauling configurations (ref.: CS 27.337). This vertical
load factor should be applied to the maximum external load for which the
application is being made, together with a minimum safety factor of 1.5.
(B) HEC applications.
(1) If a safety factor
of 3.0 or more is used, it is acceptable to perform a standard static analysis
to show compliance. The safety factor should be applied to the yield strength
of the weakest component in the system (QRS, complex PCDS, and attachment load
path). If a safety factor of less than 3.0 is used, both an analysis and a
full-scale ultimate load test of the relevant parts of the system should be
performed.
(2) Since HEC applications typically involve lower gross weight configurations, a higher vertical limit load factor is required to assure that the limit load is not exceeded in service. The applicant should use either the conservative value of 3.5 g or an analytically derived maximum vertical limit load factor for the requested operating envelope. Linear interpolation between the vertical load factors of the maximum and minimum design weights may be used. However, in no case may the vertical limit load factor be less than 2.5 g for any HEC application.
(3) For the
purpose of structural analysis or test, applicants should assume a 101.2-kg
(223-pound) man as the minimum weight of each occupant carried as HEC.
NOTE: if
the HEC is engaged in work tasks that employ devices of significant added
weight (e.g. heavy backpacks, tools, fire extinguishers, etc.), the total
weight of the 101.2-kg (223-pound) man and their equipment should be assumed
in the structural analysis or test.
(iii) Critical
Structural Case. For applications involving more than one RLC class or cargo
type, the structural substantiation is required only for the most critical
case. The most critical case should be determined by rational analysis.
(iv) Jettisonable
Loads. For the substantiating analyses or tests of all jettisonable external
loads, including HEC, the maximum external load should be applied at the
maximum angle that can be achieved in service, but not less than 30 degrees.
The angle should be measured from the sling-load-line to the rotorcraft
vertical axis (z axis) and may be in any direction that can be achieved in
service. The 30-degree angle may be reduced in some or all directions if it is
impossible to obtain due to physical constraints or operating limitations. The
maximum allowable cable angle should be determined and approved. The angle
approved should be based on structural requirements, mechanical interference
limits, and flight-handling characteristics over the most critical conditions
and combinations of conditions in the approved flight envelope.
(v) Hoist
System Limit Load.
NOTE: if a hoist cable or a long-line cable is utilised, a new dynamic system is established. The characteristics of the system should be evaluated to assure that either no hazardous failure modes exist or that they are acceptably minimised. For example, the hoist cable or long-line cable may exhibit a natural frequency that could be excited by sources internal to the overall structural system (i.e. the rotorcraft) or by sources external to the system. Another example is the loading effect of the cable acting as a spring between the rotorcraft and the suspended external load.
(A) Determine
the basic loads that would result in the failure or unspooling of the hoist or
its installation, respectively.
NOTE:
This determination should be based on static strength and any significant
dynamic load magnification factors.
(B) Select
the lower of the two values as the ultimate load of the hoist system
installation.
(C) Divide
the selected ultimate load by 1.5 to determine the true structural limit load
of the system.
(D) Determine
the manufacturer’s approved ‘limit design safety factor’ (or that which the
applicant has applied for). Divide this factor into the true structural limit
load (from (C) above) to determine the hoist system’s working (or placarded)
limit load.
(E) Compare
the system’s derived limit load to that applied for one ‘g’ payload multiplied
by the maximum downward vertical load factor (NZWMAX) to determine
the critical payload’s limit value.
(F) The critical payload limit should be equal to or less than the system’s derived limit load for the installation to be approvable.
(vi) Fatigue
Substantiation Procedures
NOTE:
the term ‘hazard to the rotorcraft’ is defined to include all hazards to
either the rotorcraft, to the occupants thereof, or both.
(A) Fatigue
evaluation of NHEC applications. Any critical components of the suspended
system and their attachments (e.g. the cargo hook, or bolted or pinned truss
attachments), the failure of which could result in a hazard to the rotorcraft,
should be included in an acceptable fatigue analysis.
(B) Fatigue evaluation of HEC applications. The entire external load system, including the complex PCDS, should be reviewed on a component-by-component basis to determine which, if any, components are fatigue critical. These components should be analysed or tested to ensure that their fatigue life limits are properly determined, and the limits should then be placed in the limited life section of the maintenance manual.
(7) CS 27.865(b) and CS 27.865(c)
Procedures for Quick-Release Systems and Cargo Hooks: for jettisonable RLCs of
any applicable cargo type, both a primary quick-release system (PQRS) and a
backup quick-release system (BQRS) are required. Features that should be
considered are:
(i) The
PQRS, BQRS and their load-release devices and subsystems (such as
electronically actuated guillotines) should be separate (i.e. physically,
systematically, and functionally redundant).
(ii) The
controls for the PQRS should be installed on one of the pilot’s primary
controls, or in an equivalently accessible location. The use of an ‘equivalent
accessible location’ should be reviewed on a case-by-case basis and utilised
only where equivalent safety is clearly maintained.
(iii) The
controls for the BQRS may be less sophisticated than those of the PQRS. For
instance, manual cable cutters are acceptable provided they are listed in the
flight manual as a required device and have a dedicated, placarded storage
location.
(iv) The PQRS
should release the external load in less than 5 seconds. The BQRS should
release the external load in less than 30 seconds. This time interval begins
the moment an emergency is declared and ends when the load is released.
(v) Each
quick-release device should be designed and located to allow the pilot or a
crew member to accomplish the release of the external cargo release without
hazardously limiting the ability to control the rotorcraft during emergency
situations. The flight manual should reflect the requirement for a crew member
and their related functions.
(vi) CS
27.865(c)(1) QRS Requirements for Jettisonable HEC Operations.
(A) For
jettisonable HEC operations, both the PQRS and BQRS are required to have a
dual actuation device (DAD) for external cargo release. The DAD should be
designed to require two actions with a definite change of direction of
movement, such as opening a switch or pushbutton cover followed by a definite
change of direction in order to activate the release switch or pushbutton. Any
possibility of opening the switch cover and inadvertently releasing the load
with a single motion is not acceptable. An additional level of safety may also
be provided through the use of Advisory and Caution messages. For example, an
advisory ‘ON’ message might be illuminated when the pilot energises (but not
arms) the system with a master switch. A cautionary ‘ARMED’ message would then
illuminate when the pilot opens the switch guard. In this case, a possible
unwanted flip of the switch guard would be immediately recognised by the crew.
The switch design should be evaluated by ground or flight test. The RFM or
RFMS should contain a clear description of the DAD functionality that includes
the associated safety features, normal and emergency procedures, and
applicable advisory and caution messages.
(B) The DAD
is intended for emergency use during the phases of flight in which the HEC is
carried or retrieved. The DAD can be used for both NHEC and HEC operations.
However, because it can be used for HEC, the instructions for continued
airworthiness should be carefully reviewed and documented. The DAD can be
operated by the pilot from a primary control, or, after a command is given by
the pilot, by a crew member from a remote location. Additional safety
precautions (such as a lock wire) should be considered for a remote hoist
console in the cabin. Any emergency release function provided by a remote
hoist console should also be designed to protect against inadvertent
activation during the hoist operation. If the backup DAD is a cable cutter, it
should be properly secured, placarded and readily accessible to the crew
member who is intended to use it.
(vii) CS 27.865(b)(3)(ii) Electromagnetic Interference. Protection of the QRS against potential internal and external sources of EMI and lightning is required. This is necessary to prevent an inadvertent load release from sources such as lightning strikes, stray electromagnetic signals, and static electricity.
(A) Jettisonable
NHEC systems should not be adversely affected when exposed to the electrical
field of a minimum of 20 volts per metre (i.e. CAT U or equivalent)
radio-frequency (RF) field strength per RTCA Document DO-160/ EUROCAE ED-14.
(B) Jettisonable
HEC systems should not be adversely affected when exposed to the electrical
field of a minimum of 200 volts per metre (i.e. CAT Y) RF field strength per
RTCA Document DO-160/ EUROCAE ED-14.
(1) These RF
field threat levels may need to be increased for certain special applications
such as microwave tower and high voltage high line repairs. Separate criteria
for special applications under multi-agency regulation (such as IEEE or OSHA
standards) should also be addressed, as applicable, during certification. When
necessary, the Special Condition process can be used to establish a
practicable level of safety for specific high voltage or other special
application conditions. The helicopter High-intensity Radiated Fields (HIRF)
safety assessment should consider the effects on helicopter flight safety due
to a HIRF-induced failure or a malfunction of external load systems, such as
an uncommanded hoist winch activation without the ability to jettison, or an
uncommanded load jettison. The appropriate failure effect classification
should be assigned based on this assessment, and compliance should be
demonstrated with CS 27.1317 and the guidance in AMC 20-158. This should not
be limited to the cable cutter devices or load jettison subsystems only. In
some designs, an uncommanded load release or a hoist winch activation could
also result from a failure of the command and control circuits of the system.
(2) An
approved standard rotorcraft test, which includes the full HIRF frequency and
amplitude external and internal environments, on the QRS and any applicable
complex PCDS, or the entire rotorcraft including the QRS and any applicable
complex PCDS, could be substituted for the jettisonable NHEC and HEC systems
tests as long as the RF field strengths directly on the QRS and PCDS are shown
to equal or exceed those defined by paragraphs c.(7)(vii)(A) and c.(7)(vii)(B)
above for NHEC and HEC respectively.
(3) The EMI levels specified in paragraphs c.(7)(vii)(A) and c.(7)(vii)(B) above are total EMI levels to be applied to the QRS (and affected QRS component) boundary. The total EMI level applied should include the effects of both external EMI sources and internal EMI sources. All aspects of internally generated EMI should be carefully considered, including peaks that could occur from time-to-time due to any combination of on-board systems being operated. For example, special attention should be given to EMI from hoist operations that involve the switching of very high currents. Those currents can generate significant voltages in closely spaced wiring that, if allowed to reach some squib designs, could activate the device. Shielding, bonding, and grounding of wiring associated with operation of the hoist and the quick-release mechanism should be clearly and adequately evaluated in design and certification. When recognised good practices for such installation are applied, an analysis may be sufficient to highlight that the maximum possible pulse generated into the squib circuit will have an energy content orders of magnitude below the squib no-fire energy. If insufficient data is available for the installation and/or the squib no-fire energy, this evaluation may require testing. One acceptable test method to demonstrate the adequacy of QRS shielding, bonding, and grounding would be to actuate the hoist under maximum load, together with likely critical combinations of other aircraft electrical loads, and demonstrate that the test squibs (which are more EMI sensitive than the squibs specified for use in the QRS) do not inadvertently operate during the test.
(8) Cargo
Hooks or Equivalent Devices and their Related Systems. All cargo hooks or
equivalent devices should be approved to acceptable aircraft industry
standards. The applicant should present these standards, and any related
manufacturer’s certificates of production or qualification, as part of the
approval package.
(i) General.
Cargo hook systems should have the same reliability goals and should be
functionally demonstrated under the critical loads for NHEC and HEC, as
appropriate. All engagement and release modes should be demonstrated. If the
hook is used as a quick-release device, then the release of critical loads
should be demonstrated under conditions that simulate the maximum allowable
bank angles and speeds and any other critical operating conditions.
Demonstration of any re-latching features and any safety or warning devices
should also be conducted. Demonstration of actual in-flight emergency
quick-release capability may not be necessary if the quick-release capability
can be acceptably simulated by other means.
NOTE:
Cargo hook manufacturers specify particular shapes, sizes, and cross sections
for lifting eyes to assure compatibility with their hook design (e.g. Breeze
Eastern Service Bulletin CAB-100-41). Experience has shown that, under certain
conditions, a load may inadvertently hang up because of improper geometry at
the hook-to-eye interface that will not allow the eye to slide off an open
hook as intended.
For both
NHEC and HEC designs, the phenomenon of hook dynamic roll-out (inadvertent
opening of the hook latch and subsequent release of the load) should be
considered to assure that QRS reliability goals are not compromised. This is
of particular concern for HEC applications. Hook dynamic roll-out occurs
during certain ground-handling and flight conditions that may allow the
lifting eye to work its way out of the hook.
Hook
dynamic roll-out typically occurs when either the RLC’s sling or harness is
not properly attached to the hook, is blown by down draft, is dragged along
the ground or through water, or is otherwise placed into a dangerous
hook-to-eye configuration.
The
potential for hook dynamic roll-out can be minimised in design by specifying
particular hook-and-eye shape and cross-section combinations. For
non-jettisonable RLCs, a pin can be used to lock the hook-keeper in place
during operations.
Some
cargo hook systems may employ two or more cargo hooks for safety. These
systems are approvable. However, a loss of any load by a single hook should be
shown to not result in a loss of control of the rotorcraft. In a dual hook
system, if the hook itself is the quick-release device (i.e. if a single
release point does not exist in the load path between the rotorcraft and the
dual hooks), the pilot should have a dual PQRS that includes selectable,
co-located individual quick releases that are independent for each hook used.
A BQRS should also be present for each hook. For cargo hook systems with more
than two hooks, either a single release point should be present in the load
path between the rotorcraft and the multiple hook system, or multiple PQRSs
and BQRSs should be present.
(ii) Jettisonable
Cargo Hook Systems. For jettisonable applications, each cargo hook:
(A) should
have a sufficient amount of slack in the control cable to permit cargo hook
movement without tripping the hook release;
(B) should
be shown to be reliable (see paragraph c(1));
(C) for HEC systems, unless the cargo hook is to be the primary quick-release device, each cargo hook should be designed so that operationally induced loads cannot inadvertently release the load. For example, a simple cargo hook should have a one-way, spring-loaded gate (i.e. ‘snap hook’) that allows load attachment going into the gate but does not allow the gate to open (and subsequently lose the HEC) when an operationally induced load is applied in the opposite direction. For HEC applications, cargo hooks that also serve as quick-release devices should be carefully reviewed to assure they are reliable.
(iii) Other
Load Release Types. In some current configurations, such as those used for
high-line operations, a load release may be present that is not on the
rotorcraft but is on the PCDS itself. Examples are a tension-release device
that lets out line under an operationally induced load, or a personal rope
cutter. For long-line/sling operations, a load release may also be present
that is not on the rotorcraft but is a remote release system. The long-line
remote release allows the pilot to not release the line itself during
repetitive loading operations. The release of the load by a dedicated switch
at the pilot controls, through the secondary hook on a long line, presents
additional risks due to the possibility of the long line impacting the tail or
the main rotor after a release, due to its elasticity. These devices are
acceptable if:
(A) The
off-rotorcraft release is considered to be a ‘third release’ means. This type
of release is not a substitute for a required release (i.e. PQRS or BQRS);
(B) The
cargo hook release and the long line remote release are placed on the primary
controls in a way that avoids confusion during operation. One example of
compliance would be to place the cargo hook release on the cyclic, and the
long line remote release on the collective, to avoid any possible confusion in
the operation;
(C) The RFM
or RFMS includes a description of the new control in the cockpit, and its
function and an RFM or RFMS note to the pilot is included, indicating that the
helicopter hook emergency release procedures are fully applicable;
(D) The
release meets all the other relevant requirements of CS 27.865 and the methods
of this AMC or equivalent methods; and
(E) The
release has no operational or failure modes that would affect continued safe
flight and landing under any operations, critical failure modes, conditions,
or combinations of these.
For long-line remote release, the following points should be considered:
(1) The
long line should not be of an elastic material that allows spring up/rebound
when unloaded, or elevated dynamics when loaded.
(2) The long
line should have a residual weight that allows its release from the helicopter
hook when the long line is unloaded.
(3) The RFM
or RFMS should include all operating procedures to ensure that the long line
does not impact the rotors after cargo release or during unloaded flight
phases.
(4) The hook
should be designed to minimise inadvertent activation. An example may be a
protective device (cage) around the locking mechanism of the long line hook.
(5) A means
should be provided to prevent any fouling of cables in the event of a rotation
of the external load. An example may be the inclusion of a swivel or slip
ring.
(6) Installation
of a long line that is provided with electrical wiring to control the hook
will generally represent a new electromagnetic coupling path from the external
area to the internal systems that may not have been considered for type
certification. As such, the impact of this installation on the coupling to
helicopter systems, due to direct connection or cross talk to wiring, should
be addressed as part of compliance with CS 27.610, 27.1316 and 27.1317.
(9) Cable
(i) Cable
attachment. Either the cable should be positively attached to the hoist drum
and this attachment should have ultimate load capability, or an equivalent
means should be provided to minimise the possibility of inadvertent, complete
cable unspooling.
(ii) Cable
length and marking. A length of cable closest to the cable's attachment to the
hoist drum should be visually marked to indicate to the operator that the
cable is near full extension. The length of the cable to be marked is a
function of the maximum extension speed of the system and the operator's
reaction time needed to prevent cable run out. It should be determined during
certification demonstration tests. In no case should the length be less than
3.5 drum circumferences.
(iii) Cable stops. Means should be present to automatically stop cable movement quickly when the system's extension and retraction operational limits are reached.
(10) CS 27.865(c)(2) PCDS: for all HEC
applications that use complex PCDSs, an approval is required. The complex PCDS
may be either previously approved or is required to be approved during
certification. In either case, its installation should be approved.
NOTE:
Complex PCDS designs can include relatively complex devices such as multiple
occupant cages or gondolas. The purpose of the complex PCDS is to provide a
minimum acceptable level of safety for personnel being transported outside the
rotorcraft. The personnel being transported may be healthy or injured,
conscious or unconscious.
(i) Regulation
(EU) No 965/2012 on Air Operations contains the minimum performance
specifications and standards for simple PCDSs, such as HEC body harnesses.
(ii) Static
Strength. The complex PCDS should be substantiated for the allowable ultimate
load and loading conditions as determined under paragraph c(6) above.
(iii) Fatigue. The complex PCDSs should be substantiated for fatigue as determined under paragraph c(6) above.
(iv) Personnel
Safety. For each complex PCDS design, the applicant should submit a design
evaluation that assures the necessary level of personnel safety is provided.
As a minimum, the following should be evaluated:
(A) The
complex PCDS should be easily and readily entered or exited.
(B) It
should be placarded with its proper capacity, the internal arrangement and
location of occupants, and ingress and egress instructions.
(C) For door
latch fail-safety, more than one fastener or closure device should be used.
The latch device design should provide direct visual inspectability to assure
it is fastened and secured.
(D) Any
fabric used should be durable and should be at least flame-resistant.
(E) Reserved
(F) Occupant
retention devices and the related design safety features should be used as
necessary. In simple designs, rounded corners and edges with adequate
strapping (or other means of HEC retention relative to the complex PCDS) and
head supports or pads may be all the safety features that are necessary.
Complex PCDS designs may require safety features such as seat belts,
handholds, shoulder harnesses, placards, or other personnel safety standards.
(v) EMI and
Lightning Protection. All essential, affected components of the complex PCDS,
such as intercommunication equipment, should be protected against RF field
strengths to a minimum of RTCA Document DO-160/
EUROCAE ED-14 CAT Y.
(vi) Instructions
for Continued Airworthiness. All instructions and documents necessary for
continued airworthiness, normal operations and emergency operations should be
completed, reviewed and approved during the certification process. There
should be clear instructions to describe when the complex PCDS is no longer
serviceable and should be replaced in part or as a whole due to wear, impact
damage, fraying of fibres, or other forms of degradation. In addition, any
life limitations resulting from compliance with paragraphs c (10)(ii) and
(iii) should be provided.
(vii) Flotation
Devices. Complex PCDSs that are intended to have a dual role as flotation
devices or life preservers should meet the relevant requirements for ‘Life
Preservers’. Also, any PCDS design to be used in the water should have a flotation
kit. The flotation kit should support the weight of the maximum number of
occupants and the complex PCDS in the water and minimise the possibility of
the occupants floating face down.
(viii) Considerations
for flight testing. It should be shown by flight tests that the device
is safely controllable and manoeuvrable during all requested flight regimes
without requiring exceptional piloting skill. The flight tests should entail
the complex PCDS weighted to the most critical weight. Some complex PCDS
designs may spin, twist or otherwise respond unacceptably in flight. Each of
these designs should be structurally restrained with a device such as a
spider, a harness, or an equivalent device to minimise undesirable flight
dynamics.
(ix) Medical Design Considerations. Complex PCDSs should be designed to the maximum practicable extent and placarded to maximise the HEC’s protection from medical considerations such as blocked air passages induced by improper body configurations and excessive losses of body heat during operations. Injured or water-soaked persons may be exposed to high body heat losses from sources such as rotor washes and the airstreams. The safety of occupants of complex PCDSs from transit-induced medical considerations can be greatly increased by proper design.
(x) Hoist
operator safety device. When hoisting operations require the presence of a
hoist operator on board, appropriate provisions should be provided to allow
the hoist operator to perform their task safely. These provisions shall
include an appropriate hoist operator restraint system. This safety device is
typically composed of a safety harness and a strap attached to the cabin, used
to adequately restrain the hoist operator inside the cabin while operating the
hoist. For certification approval, the hoist operator safety device should
comply with CS 27.561(b)(3) for personnel safety. The applicant should submit
a design evaluation that assures the necessary level of personnel safety is
provided. As a minimum, the following should be evaluated:
(A) The
strap attaching point on the body harness should be appropriately located in
order to minimise, as far as is practicable, the likelihood of injury to the
wearer in the case of a fall or crash.
(B) The safety device should be designed to be adjustable so that the strap is tightened behind the hoist operator.
(C) The
strap should allow the hoist operator to detach themselves quickly from the
cabin in emergency conditions (e.g. crash, ditching). For that purpose, it
should include a QRS including a DAD.
(D) The
safety device should be easily and readily donned or doffed.
(E) It
should be placarded with its proper capacity and lifetime limitation.
(F) Any fabric used should be durable and should be at least flame resistant.
(11) CS 27.865(c)(4) Intercom Systems for HEC Operations: for all HEC operations, the rotorcraft is required to be equipped for, or otherwise allow, direct intercommunication under any operational conditions among crew members and the HEC. An intercommunications system may also be approved as part of the external load system, or alternatively, a limitation may be placed in the RFM or RFMS as described under paragraph c.(4)(ii)(B)(2) of this AMC.
(12) CS
27.865(e) External Loads Placards and Markings: placards and markings should
be installed next to the external-load attaching means, in a clearly
noticeable location, that state the primary operational limitations —
specifically including the maximum authorised external load. Not all
operational limitations need be stated on the placard (or equivalent
markings); only those that are clearly necessary for immediate reference in
operations. Other more detailed operational limitations of lesser immediate
importance should be stated either directly in the RFM or in an RFM
supplement.
(13) Other Considerations
(i) Agricultural
Installations (AIs): AIs can be approved for either jettisonable or
non-jettisonable NHEC or HEC operations as long as they meet relevant
certification and operations requirements and follow appropriate compliance
methods. However, most current AI designs are external fixtures (see
definition), not external loads. External fixtures are not approvable as
jettisonable external cargo because they do not have a true payload (see
definition), true jettison capability (see definition), or a complete QRS.
Many AI designs can dump their solid or liquid chemical loads by use of a
‘purge port’ release over a relatively long time period (i.e. greater than 30
seconds). This is not considered to be a true jettison capability (see
definition) since the external load is not released by a QRS and since the
release time span is typically greater than 30 seconds (ref.: b(20) and c(7)).
Thus, these types of AIs should be approved as non-jettisonable external
loads. However, other designs that have the entire AI (or significant portions
thereof) attached to the rotorcraft, that have short time frame jettison (or
release) capabilities provided by QRSs that meet the definitions herein and
that have no post-jettison characteristics that would endanger continued safe
flight and landing may be approved as jettisonable external loads. For
example, if all the relevant criteria are properly met, a jettisonable fluid
load can be approved as an NHEC external cargo. FAA AC 27-1B Change 7 AC 27 MG
5 discusses other AI certification methodologies.
(ii) External
Tanks: external tank configurations that have true payload (see definition)
and true jettison capabilities (see definition) should be approved as
jettisonable NHEC. External tank configurations that have true payload
capabilities but do not have true jettison capabilities should be approved as
non-jettisonable NHEC. An external tank that has neither a true payload
capability nor true jettison capability is an external fixture; it should not
be approved as an external load under CS 27.865. If an
external tank is to be jettisoned in flight, it should have a QRS that is
approved for the maximum jettisonable external tank payload and is either
inoperable or is otherwise rendered reliable to minimise inadvertent jettisons
above the maximum jettisonable external tank payload.
(iii) Logging
Operations: These operations are very susceptible to low-cycle fatigue because
of the large loads and relatively high load cycles that are common to this
industry. It is recommended that load-measuring devices (such as load cells)
be used to assure that no unrecorded overloads occur and to assure that cycles
producing high fatigue damage are properly considered. Cycle counters are
recommended to assure that acceptable cumulative fatigue damage levels are
identifiable and are not exceeded. As either a supplementary method or an
alternate method, maintenance instructions should be considered to assure
proper cycle counting and load recording during operations.
[Amdt No: 27/5]
[Amdt No: 27/6]
[12] Commission Regulation (EU) No 965/2012 of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation (EC) No 216/2008 of the European Parliament and of the Council (OJ L 296, 25.10.2012, p. 1).
EASA CS-27.865 addresses helicopter external load certification, covering human (HEC) and non-human (NHEC) cargo. It defines equipment, quick-release systems, and safety requirements. Certification involves structural analysis, testing, and flight manual supplements. Reliability, jettison procedures, and continued airworthiness are crucial, especially for HEC operations, ensuring safe external load carriage.
* Summary by Aviation.Bot - Always consult the original document for the most accurate information.
Loading collections...