GENERAL
— INTERACTIONS BETWEEN AIRSPACE CHANGE PROCESS AND FLIGHT PROCEDURE DESIGN
PROCESS
When an airspace change includes the design of a new flight procedure or the modification of an existing flight procedure and the initiator is at the same time the flight procedure design service provider, both processes might run in parallel.
When the initiator is a different organisation than the flight procedure design service provider, this flight procedure design process can be regarded as a sub-process of the wider process as depicted in Figure 1.
Figure 1 shows the interactions between the airspace change process and the flight procedure design process.
Figure 1: Interactions between airspace change process and flight procedure design process
[...]