ED Decision 2017/004/R
ROUTE AND INSTRUMENT PROCEDURE SELECTION
The following should be considered by the operator, as appropriate, depending on the use of a risk period:
(a) Departure
The operator should ensure, to the extent possible, that the instrument departure procedures to be followed are those guaranteeing that the flight path allows, in the event of power loss, the aeroplane to land on a landing site.
(b) Arrival
The operator should ensure, to the extent possible, that the arrival procedures to be followed are those guaranteeing that the flight path allows, in the event of power loss, the aeroplane to land on a landing site.
(c) En route
The operator should ensure that any planned or diversionary route should be selected and be flown at an altitude such that, in the event of power loss, the pilot is able to make a safe landing on a landing site.
Loading collections...