ED
Decision 2020/002/R
The following
tables provide a summary of Part-ML main provisions and alleviations
established in ML.A.201, ML.A.302, ML.A.801 and ML.A.901.
In the tables,
the term ‘CAO(-CAM)’ designate a CAO with continuing airworthiness management
privileges.
|
Balloon |
|||
|
Part-BOP Subpart ADD |
Part-BOP non-Subpart
ADD |
||
|
commercial ATO/DTO |
Non-ATO/DTO or
non-commercial ATO/DTO |
||
|
Contract with CAMO/CAO (CAM) required? |
yes |
yes |
no* |
|
Aircraft maintenance programme
(AMP) |
The AMP document must be
approved by the contracted CAMO/CAO(-CAM) |
If there is no CAMO/CAO(-CAM), the AMP must be declared by the owner. |
|
|
If there is a contracted
CAMO/CAO(-CAM),
the AMP must be approved by the CAMO/CAO(-CAM). |
|||
|
If ML.A.302(e)
conditions are met, producing an AMP document is not required. |
|||
|
Maintenance |
By a maintenance
organisation |
By a maintenance
organisation or by independent certifying staff or the pilot-owner** |
|
|
Airworthiness review
(AR) and airworthiness review certificate (ARC) |
By a maintenance
organisation*** or by the contracted CAMO/CAO(-CAM) or by the competent authority |
By a maintenance
organisation*** |
|
|
Sailplane |
|||
|
Part-SAO Subpart-DEC |
Part-SAO non-Subpart-DEC |
||
|
commercial
ATO/DTO |
Non-ATO/DTO or
non-commercial ATO/DTO |
||
|
Contract with
CAMO/CAO |
yes |
yes |
no* |
|
AMP |
The AMP document must be approved by the contracted CAMO/CAO(-CAM). |
If there is no CAMO/CAO(-CAM), the AMP must be declared by the owner. |
|
|
If there is a contracted CAMO/CAO(-CAM), the AMP must be approved by the CAMO/CAO(-CAM). |
|||
|
If ML.A.302(e) conditions are met, producing an AMP document is not required. |
|||
|
Maintenance |
By a maintenance organisation |
By a maintenance organisation or by independent certifying staff or pilot-owner** |
|
|
AR and ARC |
By a maintenance organisation*** or by the contracted CAMO/CAO(-CAM) or by the competent authority |
By a
maintenance organisation*** |
|
|
Aircraft (other than
balloons and sailplanes) |
|||
|
non Part-NCO |
Part-NCO |
||
|
commercial ATO/DTO |
Non-ATO/DTO or
non-commercial ATO/DTO |
||
|
Contract with CAMO/CAO |
yes |
yes |
no* |
|
AMP |
The AMP document must be approved by the contracted
CAMO/CAO(-CAM). |
If there is no CAMO/CAO(-CAM), the AMP must be declared by the owner. |
|
|
If there is a contracted CAMO/CAO(-CAM), the AMP must be approved by the CAMO/CAO(-CAM). |
|||
|
If ML.A.302(e) conditions are met, producing an AMP
document is not required. |
|||
|
Maintenance |
By a maintenance organisation |
By a maintenance organisation or by independent
certifying staff or the pilot-owner** |
|
|
AR and ARC |
By a maintenance
organisation*** or by the contracted CAMO/CAO(-CAM) or by the competent authority |
By a maintenance
organisation*** |
|
*: A
CAMO/CAO(-CAM) is not
required but the owner may decide to contract a CAMO/CAO(-CAM).
**: in the
limit of their privileges
***: together with the 100-h/annual inspection
Loading collections...