(1) Telephone
contact details of the competent authority, including the country
code. Email address to be provided, as well as fax if available.
(2) Insertion
of associated air operator certificate (AOC) number.
(3) Insertion
of the operatorās registered name and the operatorās trading
name, if different. Insert āDbaā (for āDoing business asā)
before the trading name.
(4) Issue
date of the operations specifications (dd-mm-yyyy) and signature
of the competent authority representative.
(5) Insertion
of ICAO designation of the aircraft make, model and series, or
master series, if a series has been designated (e.g.
Boeing-737-3K2 or Boeing-777-232) or insertion of the VTOL-capable
aircraft make, model and series, as applicable.
(6) The
registration marks are listed either in the operations
specifications or in the operations manual. In the latter case,
the related operations specifications must make a reference to the
related page in the operations manual. In case not all specific
approvals apply to the aircraft model, the registration marks of
the aircraft may be entered in the āRemarksā column to the
related specific approval.
(7) Other
type of transportation (e.g. emergency medical service) to be
specified.
(8) Listing
of geographical area(s) of authorised operation (by geographical
coordinates or specific routes, flight information region or
national or regional boundaries).
(9) Listing
of applicable special limitations (e.g. VFR only, Day only, etc.).
(10) List
in this column the most permissive criteria for each approval or
the approval type (with appropriate criteria).
(11) Insertion
of approved minimum take-off RVR in metres. One line per approval
may be used if different approvals are granted.
(12) Insertion
of applicable precision approach category: CAT II or CAT III.
Insertion of minimum RVR in metres and DH in feet. One line is
used per listed approach category.
(13) Insertion
of applicable operational credit: SA CAT I, SA CAT II, EFVS, etc.
Insertion of minimum RVR in metres and DH in feet. One line is
used per listed operational credit.
(14) The
āNot Applicableā (N/A) box may be checked only if the aircraft
maximum ceiling is below FL290.
(15) Extended
range operations (ETOPS) currently apply
only to two-engined aircraft. Therefore, the āNot Applicableā
(N/A) box may be checked if the aircraft model has fewer or more
than two engines.
(16) The
threshold distance may also be listed (in NM), as well as the
engine type.
(17) Performance-based
navigation (PBN): one line is used for each complex PBN-specific
approval (e.g. RNP AR APCH), with appropriate limitations listed
in the āSpecificationsā or āRemarksā columns, or in both.
Procedure-specific approvals of specific RNP AR APCH procedures
may be listed in the operations specifications or in the
operations manual. In the latter case, the related operations
specifications must have a reference to the related page in the
operations manual.
(18) Specify
if the specific approval is limited to certain runway ends or
aerodromes, or both.
(19) Insertion
of the particular airframe or engine combination.
(20) Approval
to conduct the training course and examination to be completed by
applicants for a cabin crew attestation as specified in Annex V
(Part-CC) to Regulation (EU) No 1178/2011.
(21) Approval
to issue cabin crew attestations as specified in Annex V (Part-CC)
to Regulation (EU) No 1178/2011.
(22) Insertion
of the list of type B EFB applications together with the reference
of the EFB hardware (for portable EFBs). This list is contained
either in the operations specifications or in the operations
manual. In the latter case, the related operations specifications
must make a reference to the related page in the operations
manual.
(23) The
approval reference of the organisation responsible for managing
the continuing airworthiness of the aircraft and a reference to
the relevant regulation (e.g. Annex Vc (Part-CAMO) to Regulation
(EU) No 1321/2014).
(24) Other
approvals or data may be entered here, using one line (or one
multi-line block) per authorisation (e.g. shortālanding
operations, steep-approach operations, reduced required landing
distance, helicopter operations to or from a public interest site,
helicopter operations over a hostile environment located outside a
congested area, helicopter operations without a safe forced
landing capability, operations with increased bank angles, maximum
distance from an adequate aerodrome for two-engined aeroplanes
without an ETOPS approval).
EASA
FORM 139 ā Issue 9
|