Navigate / EASA

CS ACNS.D.ADSB.115ย Horizontal Position and Velocity Total Latency

ED Decision 2013/031/R

(See AMC1 ACNS.D.ADSB.115 and 120)

Measured from the time of applicability within the source, the total latency of the horizontal position and horizontal velocity data introduced by the ADS-B Out system does not exceed 1.5 second.