AMC1 ACNS.C.PBN.905 Fixed radius transition
(FRT) requirements
ED Decision 2019/011/R
The installation of equipment with an ETSO authorisation against ETSO-C115d satisfies the requirement.
[Reference ED-75D § 3.2.5.4.2]
[Issue: CS-ACNS/2]
AMC1 ACNS.C.PBN.905 Fixed radius transition
(FRT) requirements
ED Decision 2019/011/R
The installation of equipment with an ETSO authorisation against ETSO-C115d satisfies the requirement.
[Reference ED-75D § 3.2.5.4.2]
[Issue: CS-ACNS/2]
Aviation.Bot is an AI tool that assists you with aviation compliance.
Join all world-wide aviation professionals who use Aviation.Bot. Create a free account to unlock the full potential of our AI-powered aviation regulations assistant.
-->