Navigate / EASA

ANNEX V — CRITERIA FOR THE ASSESSMENT OF THE DRAFT NETWORK PERFORMANCE PLAN

Regulation (EU) 2019/317

(a)     Completeness of the draft Network Performance Plan in terms of the elements needed to assess compliance with the requirements listed in Article 10(5) and Annex III;

(b)     comprehensiveness of the actions taken by the Network Manager to contribute to network optimisation covering the actions listed in point 2 of Annex III;

(c)      consistency of the target on the level of effectiveness of safety management of the Network Manager with the Union-wide performance targets, by which, for each calendar year of the reference period, the level of effectiveness of safety management is equal to, or higher than, the corresponding Union-wide performance targets;

(d)     flight efficiency improvement measures generated by the European Route Network Design function;

(e)     en route ATFM delay savings from the Cooperative Decision-Making network procedures and Network Manager Operations Centre actions;

(f)      arrival ATFM delay savings from the Cooperative Decision-Making network procedures and Network Manager Operations Centre actions;

(g)     adequacy of the measures aimed at achieving the performance targets for the network functions including the relevance of investments and capital expenditure as regards the European ATM Master Plan, the common projects referred to in Article 15a of Regulation (EC) No 550/2004 and Regulation (EU) No 409/2013, and, where applicable, the Network Strategy Plan.