AviationBot
Navigate / EASA / CS E AMDT 5 / SUBPART E - TURBINE ENGINES: TYPE SUBSTANTIATION /

CS-E 920 Over-temperature Test

EASA Logo

CS-E 920  Over-temperature Test

ED Decision 2007/015/R

(See AMC E 920)

For Engines with 30-Second and 2-Minute OEI Power ratings, the Engine must be run for a period of 4 minutes at the maximum power-on rotor speed with the turbine entry gas temperature at least 19°C higher than the 30-Second OEI Power rating operating temperature limit. Following this test, the turbine assembly may exhibit distress beyond the limits for an over-temperature condition provided the Engine is shown by analysis or test or both to maintain the integrity of the turbine assembly.

[Amdt. No.: E/1]

Related

AI for Aviation Professionals

Aviation.Bot is an AI tool that assists you with aviation compliance.