CS 25J1045 Cooling test procedures
Available versions for ERULES-1963177438-9350
ED Decision 2005/006/R
found in: CS-25 Amdt 27 - Large Aeroplanes (Jan 2023)
Version
CS-25 Amdt 27 - La... (Jan 2023)
Section
Share
Version
Show details
Hide details
Version
CS 25J1045 Cooling test procedures ED Decision 2005/006/R (a) Compliance with [CS 25J1041](#_DxCrossRefBm1709821911) must be shown for the critical conditions that correspond to the applicable performance requirements. The cooling tests must be conducted with the aeroplane in the configuration, and operating under the conditions that are critical relative to cooling. For the cooling tests, a temperature is 'stabilised' when its rate of change is less than 1°C per minute. (b) Temperatures must be stabilised prior to entry into each critical condition being investigated, unless the entry condition normally is not one during which component and APU fluid temperatures would stabilise (in which case, operation through the full entry condition must be conducted before entry into the critical condition being investigated in order to allow temperatures to reach their natural levels at the time of entry). (c) Cooling tests for each critical condition must be continued until: (1) The component and APU fluid temperatures stabilise; (2) The stage of flight is completed; or (3) An operating limitation is reached. [Amdt 25/1]