Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC 25.201(d)(3) Stall demonstration
Available versions for ERULES-1963177438-8329
ED Decision 2003/2/RM
found in: CS-25 Amdt 27 - Large Aeroplanes (Jan 2023)
Version
...23)
Text
Removed: 0
Added: 0
Unchanged: 0
Share
AMC 25.201(d)(3) Stall demonstration ED Decision 2003/2/RM An acceptable interpretation of holding the pitch control on the aft stop for a short time is: a. The pitch control reaches the aft stop and is held full aft for 2 seconds or until the pitch attitude stops increasing, whichever occurs later. b. In the case of turning flight stalls, recovery may be initiated once the pitch control reaches the aft stop when accompanied by a rolling motion that is not immediately controllable (provided the rolling motion complies with [CS 25.203(c)](#_DxCrossRefBm1709820862)). c. For those aeroplanes where stall is defined by full nose up longitudinal control for both forward and aft C.G., the time at full aft stick should be not less than was used for stall speed determination, except as permitted by paragraph (b) above.