Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
M.A.708 Continuing airworthiness management
Available versions for ERULES-1963177438-762
Regulation (EU) 2020/270
found in: Continuing Airworthiness (1321/2014) Part-M Part-145 Part-66 Part-147 Part-T Part-ML Part-CAMO Part-CAO (Jul 2024)
From
Continuing Airwort... (Sep 2025)
Continuing Airwort... (Jul 2024)
From section
To
Continuing Airwort... (Sep 2025)
Continuing Airwort... (Jul 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
M.A.708 Continuing airworthiness management Regulation (EU) 2020/270 (a) The organisation shall ensure that all continuing airworthiness management is carried out in accordance with Section A, Subpart C of this Annex (Part-M), and Section A, Subpart C of Annex Vb (Part-ML), as applicable. (b) For every aircraft managed, the approved continuing airworthiness management organisation shall: 1. ensure that an aircraft maintenance programme including any applicable reliability programme, as required by point [M.A.302](#_DxCrossRefBm1518544873) of this Annex (Part-M) or [ML.A.302](#_DxCrossRefBm1518544876) of Annex Vb (Part-ML), as applicable, is developed and controlled, 2. for aircraft not used by air carriers licensed in accordance with Regulation (EC) No 1008/2008, provide a copy of the aircraft maintenance programme to the owner or operator responsible in accordance with point [M.A.201](#_DxCrossRefBm1518544875) of this Annex (Part-M) or [ML.A.201](#_DxCrossRefBm1518544881) of Annex Vb (Part-ML), as applicable, 3. manage the approval of modification and repairs, 4. ensure that all maintenance is carried out in accordance with the approved maintenance programme and released in accordance with Section A, Subpart H of this Annex (Part-M) or Section A, Subpart H of Annex Vb (Part-ML), as applicable, 5. ensure that all applicable airworthiness directives and operational directives with a continuing airworthiness impact, are applied, 6. ensure that all defects discovered during scheduled maintenance or reported are corrected by an appropriately approved maintenance organisation, 7. ensure that the aircraft is taken to an appropriately approved maintenance organisation whenever necessary, 8. coordinate scheduled maintenance, the application of airworthiness directives, the replacement of service life limited parts, and component inspection to ensure the work is carried out properly, 9. manage and archive all continuing airworthiness records and/or operator's technical log. 10. ensure that the mass and balance statement reflects the current status of the aircraft. (c) In the case of complex motor-powered aircraft or aircraft used for CAT, or aircraft used for commercial specialised operations or commercial ATO or commercial DTO operations, when the CAMO is not appropriately approved in accordance with Annex II (Part-145) or Subpart F of this Annex (Part-M) or Annex Vd (Part-CAO), the organisation shall, in consultation with the operator, establish a written maintenance contract with an organisation approved in accordance with Annex II (Part-145) or Subpart F of this Annex (Part-M) or Annex Vd (Part-CAO) or with another operator, detailing the functions specified under points [M.A.301(b)](#_DxCrossRefBm1518544874), M.A.301(c), M.A.301(f) and M.A.301(g) of this Annex (Part-M), or points [ML.A.301(b)](#_DxCrossRefBm1518545158) to (e) of Annex Vb (Part-ML), ensuring that all maintenance is ultimately carried out by a maintenance organisation approved in accordance with Annex II (Part-145) or Subpart F of this Annex (Part-M) or Annex Vd (Part-CAO) and defining the support of the quality functions referred to in point [M.A.712(b)](#_DxCrossRefBm1518544957) of this Annex (Part-M). (d) Notwithstanding point (c), the contract may be in the form of individual work orders addressed to the maintenance organisation approved in accordance with Annex II (Part-145) or Subpart F of this Annex (Part-M) or Annex Vd (Part-CAO) in the case of: 1. an aircraft requiring unscheduled line maintenance; 2. component maintenance, including engine maintenance.
#### M.A.708 Continuing airworthiness management *Regulation (EU) 2020/270* (a) The organisation shall ensure that all continuing airworthiness management is carried out in accordance with Section A, Subpart C of this Annex (Part-M), and Section A, Subpart C of Annex Vb (Part-ML), as applicable. (b) For every aircraft managed, the approved continuing airworthiness management organisation shall: 1. ensure that an aircraft maintenance programme including any applicable reliability programme, as required by point [M.A.302](#_DxCrossRefBm1203439760) of this Annex (Part-M) or [ML.A.302](#_DxCrossRefBm1203439763) of Annex Vb (Part-ML), as applicable, is developed and controlled, 2. for aircraft not used by air carriers licensed in accordance with Regulation (EC) No 1008/2008, provide a copy of the aircraft maintenance programme to the owner or operator responsible in accordance with point [M.A.201](#_DxCrossRefBm1203439762) of this Annex (Part-M) or [ML.A.201](#_DxCrossRefBm1203439768) of Annex Vb (Part-ML), as applicable, 3. manage the approval of modification and repairs, 4. ensure that all maintenance is carried out in accordance with the approved maintenance programme and released in accordance with Section A, Subpart H of this Annex (Part-M) or Section A, Subpart H of Annex Vb (Part-ML), as applicable, 5. ensure that all applicable airworthiness directives and operational directives with a continuing airworthiness impact, are applied, 6. ensure that all defects discovered during scheduled maintenance or reported are corrected by an appropriately approved maintenance organisation, 7. ensure that the aircraft is taken to an appropriately approved maintenance organisation whenever necessary, 8. coordinate scheduled maintenance, the application of airworthiness directives, the replacement of service life limited parts, and component inspection to ensure the work is carried out properly, 9. manage and archive all continuing airworthiness records and/or operator's technical log. 10. ensure that the mass and balance statement reflects the current status of the aircraft. (c) In the case of complex motor-powered aircraft or aircraft used for CAT, or aircraft used for commercial specialised operations or commercial ATO or commercial DTO operations, when the CAMO is not appropriately approved in accordance with Annex II (Part-145) or Subpart F of this Annex (Part-M) or Annex Vd (Part-CAO), the organisation shall, in consultation with the operator, establish a written maintenance contract with an organisation approved in accordance with Annex II (Part-145) or Subpart F of this Annex (Part-M) or Annex Vd (Part-CAO) or with another operator, detailing the functions specified under points [M.A.301(b)](#_DxCrossRefBm1203439761), M.A.301(c), M.A.301(f) and M.A.301(g) of this Annex (Part-M), or points [ML.A.301(b)](#_DxCrossRefBm1203440045) to (e) of Annex Vb (Part-ML), ensuring that all maintenance is ultimately carried out by a maintenance organisation approved in accordance with Annex II (Part-145) or Subpart F of this Annex (Part-M) or Annex Vd (Part-CAO) and defining the support of the quality functions referred to in point [M.A.712(b)](#_DxCrossRefBm1203439844) of this Annex (Part-M). (d) Notwithstanding point (c), the contract may be in the form of individual work orders addressed to the maintenance organisation approved in accordance with Annex II (Part-145) or Subpart F of this Annex (Part-M) or Annex Vd (Part-CAO) in the case of: 1. an aircraft requiring unscheduled line maintenance; 2. component maintenance, including engine maintenance.