Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
CS 27.1549 Powerplant instruments
Available versions for ERULES-1963177438-4853
ED Decision 2023/001/R
found in: CS-27 Amdt 10 - Small Rotorcraft (Feb 2023)
ED Decision 2003/15/RM
found in: CS-27 Amdt 9 - Small Rotorcraft (Dec 2021)
From
CS-27 Amdt 10 - Sm... (Feb 2023)
CS-27 Amdt 9 - Sma... (Dec 2021)
From section
To
CS-27 Amdt 10 - Sm... (Feb 2023)
CS-27 Amdt 9 - Sma... (Dec 2021)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
CS 27.1549 Powerplant instruments ED Decision 2023/001/R For each required powerplant instrument, as appropriate to the type of instrument: (a) Each maximum and, if applicable, minimum safe operating limit must be marked with a red line; (b) Each normal operating range must be depicted as a green or unmarked range; (c) Each take-off and precautionary range must be marked with a yellow range or yellow line; (d) Each engine or propeller range that is restricted because of excessive vibration stresses must be marked with red ranges or red lines; and (e) Each OEI limit or approved operating range must be marked to be clearly differentiated from the markings of sub-paragraphs (a) to (d) except that no marking is normally required for the 30-second OEI limit.
CS 27.1549 Powerplant instruments ED Decision 2003/15/RM For each required powerplant instrument, as appropriate to the type of instrument: (a) Each maximum and, if applicable, minimum safe operating limit must be marked with a red radial or a red line; (b) Each normal operating range must be marked with a green arc or green line, not extending beyond the maximum and minimum safe limits; (c) Each take-off and precautionary range must be marked with a yellow arc or yellow line; (d) Each engine or propeller range that is restricted because of excessive vibration stresses must be marked with red arcs or red lines; and (e) Each OEI limit or approved operating range must be marked to be clearly differentiated from the markings of sub-paragraphs (a) to (d) except that no marking is normally required for the 30-second OEI limit.