CS 27.951 General
Available versions for ERULES-1963177438-4742
ED Decision 2003/15/RM
found in: CS-27 Amdt 10 - Small Rotorcraft (Feb 2023)
From
CS-27 Amdt 10 - Sm... (Feb 2023)
CS-27 Amdt 9 - Sma... (Dec 2021)
From section
To
CS-27 Amdt 10 - Sm... (Feb 2023)
CS-27 Amdt 9 - Sma... (Dec 2021)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
CS 27.951 General ED Decision 2003/15/RM (a) Each fuel system must be constructed and arranged to ensure a flow of fuel at a rate and pressure established for proper engine functioning under any likely operating condition, including the manoeuvres for which certification is requested. (b) Each fuel system must be arranged so that – (1) No fuel pump can draw fuel from more than one tank at a time; or (2) There are means to prevent introducing air into the system. (c) Each fuel system for a turbine engine must be capable of sustained operation throughout its flow and pressure range with fuel initially saturated with water at 27°C (80°F) and having 0.198 cc of free water per litre (0.75 cc per US gallon) added and cooled to the most critical condition for icing likely to be encountered in operation.
CS 27.951 General ED Decision 2003/15/RM (a) Each fuel system must be constructed and arranged to ensure a flow of fuel at a rate and pressure established for proper engine functioning under any likely operating condition, including the manoeuvres for which certification is requested. (b) Each fuel system must be arranged so that – (1) No fuel pump can draw fuel from more than one tank at a time; or (2) There are means to prevent introducing air into the system. (c) Each fuel system for a turbine engine must be capable of sustained operation throughout its flow and pressure range with fuel initially saturated with water at 27°C (80°F) and having 0.198 cc of free water per litre (0.75 cc per US gallon) added and cooled to the most critical condition for icing likely to be encountered in operation.