Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
CS 27.901 Installation
Available versions for ERULES-1963177438-4731
ED Decision 2003/15/RM
found in: CS-27 Amdt 9 - Small Rotorcraft (Dec 2021)
From
CS-27 Amdt 10 - Sm... (Feb 2023)
CS-27 Amdt 9 - Sma... (Dec 2021)
From section
To
CS-27 Amdt 10 - Sm... (Feb 2023)
CS-27 Amdt 9 - Sma... (Dec 2021)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
CS 27.901 Installation ED Decision 2003/15/RM (a) For the purpose of this CS-27, the powerplant installation includes each part of the rotorcraft (other than the main and auxiliary rotor structures) that: (1) Is necessary for propulsion; (2) Affects the control of the major propulsive units; or (3) Affects the safety of the major propulsive units between normal inspections or overhauls. (b) For each powerplant installation: (1) Each component of the installation must be constructed, arranged, and installed to ensure its continued safe operation between normal inspections or overhauls for the range of temperature and altitude for which approval is requested; (2) Accessibility must be provided to allow any inspection and maintenance necessary for continued airworthiness; (3) Electrical interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the safety of the installation; and (5) Design precautions must be taken to minimise the possibility of incorrect assembly of components and equipment essential to safe operation of the rotorcraft, except where operation with the incorrect assembly can be shown to be extremely improbable. (c) The installation must comply with: (1) The installation instructions provided under CS-E; and (2) The applicable provisions of this Subpart.
CS 27.901 Installation ED Decision 2003/15/RM (a) For the purpose of this CS-27, the powerplant installation includes each part of the rotorcraft (other than the main and auxiliary rotor structures) that: (1) Is necessary for propulsion; (2) Affects the control of the major propulsive units; or (3) Affects the safety of the major propulsive units between normal inspections or overhauls. (b) For each powerplant installation: (1) Each component of the installation must be constructed, arranged, and installed to ensure its continued safe operation between normal inspections or overhauls for the range of temperature and altitude for which approval is requested; (2) Accessibility must be provided to allow any inspection and maintenance necessary for continued airworthiness; (3) Electrical interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the safety of the installation; and (5) Design precautions must be taken to minimise the possibility of incorrect assembly of components and equipment essential to safe operation of the rotorcraft, except where operation with the incorrect assembly can be shown to be extremely improbable. (c) The installation must comply with: (1) The installation instructions provided under CS-E; and (2) The applicable provisions of this Subpart.