AMC1 31TGB.69(c) Electric cables and equipment
Available versions for ERULES-1963177438-4299
ED Decision 2013/011/R
found in: CS-31TGB Initial issue - Tethered Gas Balloons (Jul 2013)
Version
CS-31TGB Initial i... (Jul 2013)
Section
Share
Version
Show details
Hide details
Version
AMC1 31TGB.69(c) Electric cables and equipment ED Decision 2013/011/R The risk of short circuit for the electrical cable between battery and master switch is minimised when the unprotected battery to master switch cables, of an adequate capacity, have a maximum length of 0·5 m. In any event the capacities of protected cables are such that no hazardous damage will occur to the balloon and its occupants, nor its effects to the occupants from the generation of noxious fumes, due to electrical overloading of cables before a circuit protective device will operate.