Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC 21.A.602B(b)(2) Procedures for ETSO authorisations
Available versions for ERULES-1963177438-3960
ED Decision 2012/020/R
found in: Initial Airworthiness and Environmental Protection (748/2012) Part-21 Part-21L (Jul 2024)
From
Initial Airworthin... (Nov 2025)
Initial Airworthin... (Jul 2024)
From section
To
Initial Airworthin... (Nov 2025)
Initial Airworthin... (Jul 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC 21.A.602B(b)(2) Procedures for ETSO authorisations ED Decision 2012/020/R 1. Scope 1.1 A manual of procedures must set out specific design practices, resources and sequence of activities relevant for the specific projects, taking account of Part 21 requirements. 1.2 These procedures must be concise and limited to the information needed for quality and proper control of activities by the applicant/holder, and by the Agency. 2. Management of the ETSO authorisation process A procedure explaining how the application to the Agency and certification process to obtain an ETSOA will be made, must be established. 3. Management of design changes 3.1 A procedure taking into account [21.A.611](#_DxCrossRefBm1649097039), must be established for the classification and approval of design changes on articles under ETSO authorisation 3.2 Procedure for the classification and approval of repairs and unintentional deviations from the approved design data occurring in production (concessions or non-conformance's) must be established. 4. Obligations addressed in [21.A.609](#_DxCrossRefBm1649097335) The applicant should establish the necessary procedures to show to the Agency how it will fulfil the obligations under [21.A.609](#_DxCrossRefBm1649097335). For issue of information and instructions, a procedure following the principles of [AMC 21.A.14(b)](#_DxCrossRefBm1649096956), paragraph 4 must be established. 5. Control of design sub-contractors The applicant must establish the necessary procedures to show to the Agency how it will control design sub-contractors.
##### AMC 21.A.602B(b)(2) Procedures for ETSO authorisations *ED Decision 2012/020/R* 1. Scope 1.1 A manual of procedures must set out specific design practices, resources and sequence of activities relevant for the specific projects, taking account of Part 21 requirements. 1.2 These procedures must be concise and limited to the information needed for quality and proper control of activities by the applicant/holder, and by the Agency. 2. Management of the ETSO authorisation process A procedure explaining how the application to the Agency and certification process to obtain an ETSOA will be made, must be established. 3. Management of design changes 3.1 A procedure taking into account [21.A.611](#_DxCrossRefBm485230530), must be established for the classification and approval of design changes on articles under ETSO authorisation 3.2 Procedure for the classification and approval of repairs and unintentional deviations from the approved design data occurring in production (concessions or non-conformance's) must be established. 4. Obligations addressed in [21.A.609](#_DxCrossRefBm485230827) The applicant should establish the necessary procedures to show to the Agency how it will fulfil the obligations under [21.A.609](#_DxCrossRefBm485230827). For issue of information and instructions, a procedure following the principles of [AMC 21.A.14(b)](#_DxCrossRefBm485230447), paragraph 4 must be established. 5. Control of design sub-contractors The applicant must establish the necessary procedures to show to the Agency how it will control design sub-contractors.