Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
21.A.127 Tests: aircraft
Available versions for ERULES-1963177438-3774
Regulation (EU) No 748/2012
found in: Initial Airworthiness and Environmental Protection (748/2012) Part-21 Part-21L (Jul 2024)
From
Initial Airworthin... (Nov 2025)
Initial Airworthin... (Jul 2024)
From section
To
Initial Airworthin... (Nov 2025)
Initial Airworthin... (Jul 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
21.A.127 Tests: aircraft Regulation (EU) No 748/2012 (a) Each manufacturer of an aircraft manufactured under this Subpart shall establish an approved production ground and flight test procedure and check-off forms, and in accordance with those forms, test each aircraft produced, as a means of establishing relevant aspects of compliance with point [21.A.125A](#_DxCrossRefBm1649096929)(a). (b) Each production test procedure shall include at least the following: 1. a check on handling qualities; 2. a check on flight performance (using normal aircraft instrumentation); 3. a check on the proper functioning of all aircraft equipment and systems; 4. a determination that all instruments are properly marked, and that all placards and required flight manuals are installed after flight test; 5. a check of the operational characteristics of the aircraft on the ground; 6. a check on any other items peculiar to the aircraft being tested.
#### 21.A.127 Tests: aircraft *Regulation (EU) No 748/2012* (a) Each manufacturer of an aircraft manufactured under this Subpart shall establish an approved production ground and flight test procedure and check-off forms, and in accordance with those forms, test each aircraft produced, as a means of establishing relevant aspects of compliance with point [21.A.125A](#_DxCrossRefBm485230420)(a). (b) Each production test procedure shall include at least the following: 1. a check on handling qualities; 2. a check on flight performance (using normal aircraft instrumentation); 3. a check on the proper functioning of all aircraft equipment and systems; 4. a determination that all instruments are properly marked, and that all placards and required flight manuals are installed after flight test; 5. a check of the operational characteristics of the aircraft on the ground; 6. a check on any other items peculiar to the aircraft being tested.