Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC1 145.A.10 Scope
Available versions for ERULES-1963177438-296
ED Decision 2022/011/R
found in: Continuing Airworthiness (1321/2014) Part-M Part-145 Part-66 Part-147 Part-T Part-ML Part-CAMO Part-CAO (Jul 2024)
From
Continuing Airwort... (Sep 2025)
Continuing Airwort... (Jul 2024)
From section
To
Continuing Airwort... (Sep 2025)
Continuing Airwort... (Jul 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC1 145.A.10 Scope ED Decision 2022/011/R LINE MAINTENANCE AND BASE MAINTENANCE (a) ‘Line maintenance’ refers to limited maintenance for the aircraft suitable to be carried out whilst the aircraft remains in the air operation environment. Line maintenance may include: - trouble shooting; - defect rectification; - component replacement with use of external test equipment if required. Component replacement may include components such as engines and propellers; - maintenance that will detect obvious unsatisfactory conditions/discrepancies/malfunctions, but does not require extensive in-depth inspection. It may also include internal structure, systems and powerplant items which are visible through quick opening access panels/doors/ports; - repairs, modifications and other maintenance tasks which do not require extensive disassembly and can be accomplished by simple means. (b) ‘Base maintenance’ refers to any maintenance for the aircraft other than line maintenance. (c) Organisations maintaining aircraft should have a procedure to determine whether the tasks or groups of tasks to be carried out fall under the line maintenance or base maintenance scope of the organisation, with due regard to the expected duration of the maintenance, number and type of tasks, shifts and disciplines involved, work environment, etc. For temporary or occasional cases, the organisation may also have a procedure which allows, subject to a task assessment (including all relevant aspects and conditions), to conduct a base maintenance task under line maintenance environment. (d) In particular, maintenance tasks of aircraft subject to ‘progressive’ or ‘equalised’ maintenance programmes should be individually assessed in respect of such procedure to ensure that all the tasks within the particular check can be carried out safely and to the required standards at the designated line maintenance station.
##### AMC1 145.A.10 Scope *ED Decision 2022/011/R* **LINE MAINTENANCE AND BASE MAINTENANCE** (a) ‘Line maintenance’ refers to limited maintenance for the aircraft suitable to be carried out whilst the aircraft remains in the air operation environment. Line maintenance may include: - trouble shooting; - defect rectification; - component replacement with use of external test equipment if required. Component replacement may include components such as engines and propellers; - maintenance that will detect obvious unsatisfactory conditions/discrepancies/malfunctions, but does not require extensive in-depth inspection. It may also include internal structure, systems and powerplant items which are visible through quick opening access panels/doors/ports; - repairs, modifications and other maintenance tasks which do not require extensive disassembly and can be accomplished by simple means. (b) ‘Base maintenance’ refers to any maintenance for the aircraft other than line maintenance. (c) Organisations maintaining aircraft should have a procedure to determine whether the tasks or groups of tasks to be carried out fall under the line maintenance or base maintenance scope of the organisation, with due regard to the expected duration of the maintenance, number and type of tasks, shifts and disciplines involved, work environment, etc. For temporary or occasional cases, the organisation may also have a procedure which allows, subject to a task assessment (including all relevant aspects and conditions), to conduct a base maintenance task under line maintenance environment. (d) In particular, maintenance tasks of aircraft subject to ‘progressive’ or ‘equalised’ maintenance programmes should be individually assessed in respect of such procedure to ensure that all the tasks within the particular check can be carried out safely and to the required standards at the designated line maintenance station.