AMC2 ADR.OPS.B.070 Aerodrome works safety
Available versions for ERULES-1963177438-2801
ED Decision 2021/003/R
found in: Aerodromes (139/2014) Part-ADR.AR Part-ADR.OR Part-ADR.OPS CS-ADR-DSN CS-HPT-DSN (Dec 2024)
From
Aerodromes (139/20... (Dec 2024)
Aerodromes (139/20... (Jun 2023)
From section
To
Aerodromes (139/20... (Dec 2024)
Aerodromes (139/20... (Jun 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC2 ADR.OPS.B.070 Aerodrome works safety ED Decision 2024/004/R RUNWAY PAVEMENT OVERLAYS The aerodrome operator should ensure that: (a) when a runway is to be returned temporarily to an operational status before resurfacing is complete, the longitudinal slope of the temporary ramp, measured with reference to the existing runway surface or previous overlay course, should be: (1) 0.5 to 1.0 %for overlays up to and including 5 cm in thickness; and (2) not more than 0.5 % for overlays more than 5 cm in thickness. (b) Runway overlaying proceeds from one end of the runway towards the other end so that based on runway utilisation, most aircraft operations will experience a down ramp. (c) The entire width of the runway is overlaid during each work session. (d) Before a runway being overlaid is returned to a temporary operational status, a runway centre line marking, conforming to the applicable specifications included in the aerodrome certification basis of the aerodrome, should be provided. (e) The location of any temporary threshold should be identified by a 3.6 m wide transverse stripe. [applicable until 23 May 2025 – ED Decision 2021/003/R]
AMC2 ADR.OPS.B.070 Aerodrome works safety ED Decision 2021/003/R RUNWAY PAVEMENT OVERLAYS The aerodrome operator should ensure that: (a) when a runway is to be returned temporarily to an operational status before resurfacing is complete, the longitudinal slope of the temporary ramp, measured with reference to the existing runway surface or previous overlay course, should be: (1) 0.5 to 1.0 %for overlays up to and including 5 cm in thickness; and (2) not more than 0.5 % for overlays more than 5 cm in thickness. (b) Runway overlaying proceeds from one end of the runway towards the other end so that based on runway utilisation, most aircraft operations will experience a down ramp. (c) The entire width of the runway is overlaid during each work session. (d) Before a runway being overlaid is returned to a temporary operational status, a runway centre line marking, conforming to the applicable specifications included in the aerodrome certification basis of the aerodrome, should be provided. (e) The location of any temporary threshold should be identified by a 3.6 m wide transverse stripe.