Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC1 ADR.OPS.B.100(b)(5) Suspension of runway operations and runway closure
Available versions for ERULES-1963177438-22815
ED Decision 2024/004/R
found in: Aerodromes (139/2014) Part-ADR.AR Part-ADR.OR Part-ADR.OPS CS-ADR-DSN CS-HPT-DSN (Dec 2024)
From
Easy Access Rules ... (Mar 2026)
Aerodromes (139/20... (Dec 2024)
From section
To
Easy Access Rules ... (Mar 2026)
Aerodromes (139/20... (Dec 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC1 ADR.OPS.B.100(b)(5)Suspension of runway operations and runway closure ED Decision 2024/004/R ACTIONS BEFORE RECOMMENCEMENT OF RUNWAY OPERATIONS The following actions should be completed if runway operations are recommenced following a suspension or closure of runway operations: (a) remedial works are completed, e.g. clearance of FOD, wildlife remains, runway lighting repair, removal of disabled aircraft; (b) all vehicles and personnel have vacated the runway and report to the air traffic services; (c) a runway inspection under the authorisation of air traffic services is conducted; (d) runway availability is confirmed to air traffic services; (e) relevant NOTAM, if published, is cancelled; (f) runway availability is promulgated by air traffic services using ATIS and radiotelephony. *[applicable from 24 May 2025 – ED Decision 2024/004/R]*
##### AMC1 ADR.OPS.B.100(b)(5) Suspension of runway operations and runway closure *ED Decision 2024/004/R* **ACTIONS BEFORE RECOMMENCEMENT OF RUNWAY OPERATIONS** The following actions should be completed if runway operations are recommenced following a suspension or closure of runway operations: (a) remedial works are completed, e.g. clearance of FOD, wildlife remains, runway lighting repair, removal of disabled aircraft; (b) all vehicles and personnel have vacated the runway and report to the air traffic services; (c) a runway inspection under the authorisation of air traffic services is conducted; (d) runway availability is confirmed to air traffic services; (e) relevant NOTAM, if published, is cancelled; (f) runway availability is promulgated by air traffic services using ATIS and radiotelephony.