Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 ADR.OPS.B.100(a) Suspension of runway operations and runway closure
Available versions for ERULES-1963177438-22813
ED Decision 2024/004/R
found in: Aerodromes (139/2014) Part-ADR.AR Part-ADR.OR Part-ADR.OPS CS-ADR-DSN CS-HPT-DSN (Dec 2024)
From
Easy Access Rules ... (Mar 2026)
Aerodromes (139/20... (Dec 2024)
From section
To
Easy Access Rules ... (Mar 2026)
Aerodromes (139/20... (Dec 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 ADR.OPS.B.100(a) Suspension of runway operations and runway closure ED Decision 2024/004/R SUSPENSION OF RUNWAY OPERATIONS (a) Planned and unplanned events on an aerodrome can necessitate the temporary suspension of runway operations for a short or longer period of time. (b) In the majority of cases, reasons for suspending runway operations are unplanned. Examples may include: (1) short-term removal of disabled aircraft or vehicle(s) from the runway; (2) presence of FOD on the runway; (3) significant wildlife strikes on the runway; (4) presence of an unauthorised UAS in the runway system; (5) significant failure of runway lighting; (6) ice control and snow removal operations; (7) aircraft incident, e.g. tail strike, aborted take-off, tyre burst, etc.; (8) full emergency or local stand-by. *[applicable from 24 May 2025 – ED Decision 2024/004/R]*
##### GM1 ADR.OPS.B.100(a) Suspension of runway operations and runway closure *ED Decision 2024/004/R* **SUSPENSION OF RUNWAY OPERATIONS** (a) Planned and unplanned events on an aerodrome can necessitate the temporary suspension of runway operations for a short or longer period of time. (b) In the majority of cases, reasons for suspending runway operations are unplanned. Examples may include: (1) short-term removal of disabled aircraft or vehicle(s) from the runway; (2) presence of FOD on the runway; (3) significant wildlife strikes on the runway; (4) presence of an unauthorised UAS in the runway system; (5) significant failure of runway lighting; (6) ice control and snow removal operations; (7) aircraft incident, e.g. tail strike, aborted take-off, tyre burst, etc.; (8) full emergency or local stand-by.