Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 ATM/ANS.EQMT.AR.A.030 ATM/ANS equipment directives
Available versions for ERULES-1963177438-22788
ED Decision 2024/001/R
found in: ATM/ANS Equipment (2023/1769 and 2023/1768) Part-DPO Part-ATM/ANS.EQMT (Nov 2024)
Version
ATM/ANS Equipment ... (Nov 2024)
Section
Share
Version
Show details
Hide details
Version
GM1 ATM/ANS.EQMT.AR.A.030 ATM/ANS equipment directives ED Decision 2024/001/R ATM/ANS EQUIPMENT DIRECTIVE IN CASE OF DISCONTINUATION OF DPO APPROVAL Certificates of ATM/ANS equipment issued in accordance with [Article 4](#_DxCrossRefBm1741288244) and declarations of design compliance of ATM/ANS equipment issued in accordance with [Article 5](#_DxCrossRefBm1741288243) lose their validity in case the holder of the certificate/issuer of the declaration of design compliance is no longer compliant with Implementing Regulation (EU) 2023/1769. In the above situations, EASA would typically: (a) revoke the certificate or deregister the declaration of design compliance, as appropriate; (b) inform ATM/ANS providers that are users of the ATM/ANS equipment concerned and their competent authorities, as in the absence of an approved DPO with appropriate privileges from that moment on: — the affected ATM/ANS equipment cannot be integrated into any functional system as the requirements in ATM/ANS.OR.A.045 (g) of Implementing Regulation (EU) 2017/373 will be no longer met; — the affected ATM/ANS equipment already integrated into a functional system cannot be modified until a valid certificate or declaration is in place, in accordance with points ATM/ANS.OR.A.045 (g)(1) and (g)(2) of Implementing Regulation (EU) 2017/373. This requires another DPO with appropriate privileges to take responsibility for the compliance of the equipment with the applicable technical specifications; — the continuous operation of the ATM/ANS equipment already integrated into the functional system of ATM/ANS providers may not necessarily be immediately impacted. However, ATM/ANS providers will have to consider how the absence of the DPO impacts the suitability for use of the equipment, the defined conditions of use, and any prescribed limitations; and (c) issue an ATM/ANS equipment directive to replace the ATM/ANS equipment concerned in case an unsafe, insecure, under-performing or non-interoperability condition has been identified or is likely to develop, as in the absence of a DPO with appropriate privileges and responsibility for ensuring that the equipment continues complying with the applicable technical specifications, design changes to the ATM/ANS equipment to restore performance are not possible. This ATM/ANS equipment directive will be addressed to all known users of the ATM/ANS equipment and their competent authorities. Note: In case the DPO approval is still valid, e.g. during a suspension/revocation process, EASA will require the DPO to make appropriate descriptive data and accomplishment instructions available to all known users of the ATM/ANS equipment and their competent authorities. Urgent operational needs might require certain exceptions to the principles described above, allowing integration or modification of equipment without a valid certificate or declaration. In those cases, the exemptions are to be managed under the flexibility provisions in Article 71 of Regulation (EU) 2018/1139, subject to all relevant conditions laid down in such article. In particular, the Member State must provide adequate justification for the following aspects: (1) it is not possible for another DPO to obtain a valid certificate or issue a declaration for the equipment; (2) safety, environmental protection and compliance with the applicable essential requirements are ensured, where necessary through the application of mitigation measures; (3) any possible distortion of market conditions as a consequence of the granting of the exemption will be mitigated as far as possible; and (4) the exemption is limited in scope and duration to the extent strictly necessary and it is applied in a non-discriminatory manner; and (d) take any other necessary further enforcement measures which are necessary to mitigate the consequences of the discontinuation of a DPO approval.