Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
UAM.POL.VCA.125 Take-off flight path
Available versions for ERULES-1963177438-22638
Regulation (EU) 2024/1111
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Feb 2025)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
UAM.POL.VCA.125 Take-off flight path Regulation (EU) 2024/1111 (a) From the end of the take-off distance required for VCA (TODRV), following a CFP being recognised at or after the take-off decision point (TDP): (1) the take-off mass shall be such that the take-off flight path provides vertical clearance, above all obstacles located in the climb path, of not less than 10,7 m (35 ft) for operations under VFR by day; (2) when a change of direction of more than 15° is made, allowance shall be made for the ability to maintain the climb gradient to comply with the obstacle-clearance requirements in accordance with the AFM; this change of direction is not to be initiated before reaching a height of 61 m (200 ft) above the take-off surface unless it is part of an approved take-off procedure in the AFM. (b) When showing compliance with point (a), the relevant parameters of point [UAM.POL.VCA.110(c)](#_DxCrossRefBm927681036) shall be considered at the vertiport, diversion location or operating site of departure. *[applicable from 1 May 2025 — Regulation (EU) 2024/1111]*
#### UAM.POL.VCA.125 Take-off flight path *Regulation (EU) 2024/1111* (a) From the end of the take-off distance required for VCA (TODRV), following a CFP being recognised at or after the take-off decision point (TDP): (1) the take-off mass shall be such that the take-off flight path provides vertical clearance, above all obstacles located in the climb path, of not less than 10,7 m (35 ft) for operations under VFR by day; (2) when a change of direction of more than 15° is made, allowance shall be made for the ability to maintain the climb gradient to comply with the obstacle-clearance requirements in accordance with the AFM; this change of direction is not to be initiated before reaching a height of 61 m (200 ft) above the take-off surface unless it is part of an approved take-off procedure in the AFM. (b) When showing compliance with point (a), the relevant parameters of point [UAM.POL.VCA.110(c)](#_DxCrossRefBm523090778) shall be considered at the vertiport, diversion location or operating site of departure.