Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 21L.A.124(b)(2)(vi) Management system for production
Available versions for ERULES-1963177438-22019
ED Decision 2023/013/R
found in: Initial Airworthiness and Environmental Protection (748/2012) Part-21 Part-21L (Jul 2024)
From
Initial Airworthin... (Nov 2025)
Initial Airworthin... (Jul 2024)
From section
To
Initial Airworthin... (Nov 2025)
Initial Airworthin... (Jul 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 21L.A.124(b)(2)(vi) Management system for production ED Decision 2023/013/R TESTS If relevant, the declared production organisation will have to perform functional, ground and flight tests for the manufactured products. The production ground and flight tests for new aircraft are specified by the aircraft design organisation. These tests typically include: — a check on handling qualities; — a check on flight performance (using normal aircraft instrumentation); — a check on the proper functioning of all aircraft equipment and systems; — a determination that all instruments are properly marked, and that all placards and required flight manuals are installed before flight test; — a check of the operational characteristics of the aircraft on the ground; — a check on any other items peculiar to the aircraft being tested. The functional test required for a new engine will be specified by the engine design organisation and are normally including the following: — Break-in runs that include a determination of fuel and oil consumption and a determination of power characteristics at rated maximum continuous power or thrust and, if applicable, at rated take-off power or thrust. — A period of operation at rated maximum continuous power or thrust. For engines that have a rated take-off power or thrust, part of that period should be at rated take-off power or thrust. The test equipment used for the test run should be capable of output determination of a level of accuracy sufficient to assure that the engine output delivered complies with the specified rating and operation limitations. The functional tests required for a new propeller will be specified by the propeller design organisation and are normally including several complete cycles of control throughout the propeller pitch and rotational speed ranges. In addition, for feathering and/or reversing propellers, several cycles of feathering operation and reversing operation from the lowest normal pitch to the maximum reverse pitch should normally be required. Following functional testing, each engine or propeller will need to be inspected to determine that the engine or propeller is in condition for safe operation. Such inspections are specified by the design organisation and are normally including internal inspection and examination. The degree of internal inspections should normally be determined on the basis of the positive results of previous inspections conducted on the first production engines or propeller, and on the basis of in-service experience.
##### GM1 21L.A.124(b)(2)(vi) Management system for production *ED Decision 2023/013/R* **TESTS** If relevant, the declared production organisation will have to perform functional, ground and flight tests for the manufactured products. The production ground and flight tests for new aircraft are specified by the aircraft design organisation. These tests typically include: — a check on handling qualities; — a check on flight performance (using normal aircraft instrumentation); — a check on the proper functioning of all aircraft equipment and systems; — a determination that all instruments are properly marked, and that all placards and required flight manuals are installed before flight test; — a check of the operational characteristics of the aircraft on the ground; — a check on any other items peculiar to the aircraft being tested. The functional test required for a new engine will be specified by the engine design organisation and are normally including the following: — Break-in runs that include a determination of fuel and oil consumption and a determination of power characteristics at rated maximum continuous power or thrust and, if applicable, at rated take-off power or thrust. — A period of operation at rated maximum continuous power or thrust. For engines that have a rated take-off power or thrust, part of that period should be at rated take-off power or thrust. The test equipment used for the test run should be capable of output determination of a level of accuracy sufficient to assure that the engine output delivered complies with the specified rating and operation limitations. The functional tests required for a new propeller will be specified by the propeller design organisation and are normally including several complete cycles of control throughout the propeller pitch and rotational speed ranges. In addition, for feathering and/or reversing propellers, several cycles of feathering operation and reversing operation from the lowest normal pitch to the maximum reverse pitch should normally be required. Following functional testing, each engine or propeller will need to be inspected to determine that the engine or propeller is in condition for safe operation. Such inspections are specified by the design organisation and are normally including internal inspection and examination. The degree of internal inspections should normally be determined on the basis of the positive results of previous inspections conducted on the first production engines or propeller, and on the basis of in-service experience.