Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 145.A.85(b) Changes to the organisation
Available versions for ERULES-1963177438-20055
ED Decision 2022/011/R
found in: Continuing Airworthiness (1321/2014) Part-M Part-145 Part-66 Part-147 Part-T Part-ML Part-CAMO Part-CAO (Jul 2024)
From
Continuing Airwort... (Sep 2025)
Continuing Airwort... (Jul 2024)
From section
To
Continuing Airwort... (Sep 2025)
Continuing Airwort... (Jul 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 145.A.85(b) Changes to the organisation ED Decision 2022/011/R CHANGES REQUIRING PRIOR APPROVAL (OTHER THAN THOSE COVERED BY POINT 145.A.85(A)) The following are examples of changes that require prior approval by the competent authority (other than those covered by point [145.A.85(a)](#_DxCrossRefBm1518545433)), as specified in Part-145: (a) changes to the AltMoC [[145.A.120(b)](#_DxCrossRefBm1518545534)]; (b) changes to the MOE procedure for the use of alternative tooling or equipment [[145.A.40(a)(i)](#_DxCrossRefBm1518545434)]; (c) changes to the MOE procedure allowing a B-rated organisation to carry out maintenance on an installed engine during ‘base’ and ‘line’ maintenance [[Appendix II, point (f)](#_DxCrossRefBm1518545533)]; (d) changes to the MOE procedure allowing a C-rated organisation to carry out maintenance on an installed component (other than a complete engine/APU) during ‘base’ and ‘line’ maintenance or at an engine/APU maintenance facility [[Appendix II, point (g)](#_DxCrossRefBm1518545533)]; (e) changes to the procedures to establish and control the competency of personnel [[145.A.30(e)](#DX4203032259)]; (f) changes to the system for reporting to the competent authority on the safety performance and regulatory compliance of the organisation (in the case of an extension of the oversight planning cycle beyond 36 months) [[145.B.305(d)](#_DxCrossRefBm1518545532)].
##### GM1 145.A.85(b) Changes to the organisation *ED Decision 2022/011/R* **CHANGES REQUIRING PRIOR APPROVAL (OTHER THAN THOSE COVERED BY POINT 145.A.85(A))** The following are examples of changes that require prior approval by the competent authority (other than those covered by point [145.A.85(a)](#_DxCrossRefBm1203440320)), as specified in Part-145: (a) changes to the AltMoC [[145.A.120(b)](#_DxCrossRefBm1203440421)]; (b) changes to the MOE procedure for the use of alternative tooling or equipment [[145.A.40(a)(i)](#_DxCrossRefBm1203440321)]; (c) changes to the MOE procedure allowing a B-rated organisation to carry out maintenance on an installed engine during ‘base’ and ‘line’ maintenance [[Appendix II, point (f)](#_DxCrossRefBm1203440420)]; (d) changes to the MOE procedure allowing a C-rated organisation to carry out maintenance on an installed component (other than a complete engine/APU) during ‘base’ and ‘line’ maintenance or at an engine/APU maintenance facility [[Appendix II, point (g)](#_DxCrossRefBm1203440420)]; (e) changes to the procedures to establish and control the competency of personnel [[145.A.30(e)](#DX4203032259)]; (f) changes to the system for reporting to the competent authority on the safety performance and regulatory compliance of the organisation (in the case of an extension of the oversight planning cycle beyond 36 months) [[145.B.305(d)](#_DxCrossRefBm1203440419)].