Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC1 ADR.OPS.B.036(c) Operations on specially prepared winter runways
Available versions for ERULES-1963177438-18695
ED Decision 2021/003/R
found in: Aerodromes (139/2014) Part-ADR.AR Part-ADR.OR Part-ADR.OPS CS-ADR-DSN CS-HPT-DSN (Jun 2023)
From
Easy Access Rules ... (Mar 2026)
Aerodromes (139/20... (Dec 2024)
Aerodromes (139/20... (Jun 2023)
From section
To
Easy Access Rules ... (Mar 2026)
Aerodromes (139/20... (Dec 2024)
Aerodromes (139/20... (Jun 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC1 ADR.OPS.B.036(c) Operations on specially prepared winter runways ED Decision 2021/003/R MONITORING PROGRAMME — PERFORMANCE INDICATORS The aerodrome operator should: (a) establish a system of performance indicators to systematically monitor the effectiveness of the procedures which are applied to support operations on specially prepared winter runways; (b) record the performance indicators on a monthly basis during the winter season for each runway and review them on an annual basis; and (c) prepare and make available an annual report, which includes comparison with the performance indicators of at least the previous 3 years.
AMC1 ADR.OPS.B.036(c) Operations on specially prepared winter runways ED Decision 2021/003/R MONITORING PROGRAMME — PERFORMANCE INDICATORS The aerodrome operator should: (a) establish a system of performance indicators to systematically monitor the effectiveness of the procedures which are applied to support operations on specially prepared winter runways; (b) record the performance indicators on a monthly basis during the winter season for each runway and review them on an annual basis; and (c) prepare and make available an annual report, which includes comparison with the performance indicators of at least the previous 3 years.
##### AMC1 ADR.OPS.B.036(c) Operations on specially prepared winter runways *ED Decision 2021/003/R* **MONITORING PROGRAMME — PERFORMANCE INDICATORS** The aerodrome operator should: (a) establish a system of performance indicators to systematically monitor the effectiveness of the procedures which are applied to support operations on specially prepared winter runways; (b) record the performance indicators on a monthly basis during the winter season for each runway and review them on an annual basis; and (c) prepare and make available an annual report, which includes comparison with the performance indicators of at least the previous 3 years.