AMC1 ADR.OPS.B.035(a) Operations in winter conditions
Available versions for ERULES-1963177438-18682
ED Decision 2021/003/R
found in: Aerodromes (139/2014) Part-ADR.AR Part-ADR.OR Part-ADR.OPS CS-ADR-DSN CS-HPT-DSN (Jun 2023)
From
Easy Access Rules ... (Mar 2026)
Aerodromes (139/20... (Dec 2024)
Aerodromes (139/20... (Jun 2023)
From section
To
Easy Access Rules ... (Mar 2026)
Aerodromes (139/20... (Dec 2024)
Aerodromes (139/20... (Jun 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC1 ADR.OPS.B.035(a) Operations in winter conditions ED Decision 2021/003/R AERODROME SNOW PLAN The aerodrome snow plan should reflect the exposure of the aerodrome to winter conditions and should include the following: (a) the Snow Committee members and the person in charge of the winter operation, with a chain of command giving a breakdown in duties; (b) methods of communication between aerodrome operations, air traffic services, and the MET provider; (c) the equipment available for snow clearance and surface treatment. This should include equipment for ploughing, sweeping, and blowing snow and application of materials; (d) priority of surfaces to be cleared, and clearance limits for aircraft using the aerodrome; (e) collection of information for RCR and dissemination of this information; (f) designated snow dumping or melting areas; (g) an alerting system in order that sufficient warning is given to all bodies concerned; (h) the manpower available, including staff for equipment maintenance arrangements for shifts, and call-out procedures; (i) deployment of equipment and tactical approaches to be used; (j) general principles to be followed in deciding when to close runways for snow clearance and designation of management personnel authorised to take the decision; (k) methods of assessing and reporting the surface conditions; and (l) criteria for the suspension of runway operations.
AMC1 ADR.OPS.B.035(a) Operations in winter conditions ED Decision 2021/003/R AERODROME SNOW PLAN The aerodrome snow plan should reflect the exposure of the aerodrome to winter conditions and should include the following: (a) the Snow Committee members and the person in charge of the winter operation, with a chain of command giving a breakdown in duties; (b) methods of communication between aerodrome operations, air traffic services, and the MET provider; (c) the equipment available for snow clearance and surface treatment. This should include equipment for ploughing, sweeping, and blowing snow and application of materials; (d) priority of surfaces to be cleared, and clearance limits for aircraft using the aerodrome; (e) collection of information for RCR and dissemination of this information; (f) designated snow dumping or melting areas; (g) an alerting system in order that sufficient warning is given to all bodies concerned; (h) the manpower available, including staff for equipment maintenance arrangements for shifts, and call-out procedures; (i) deployment of equipment and tactical approaches to be used; (j) general principles to be followed in deciding when to close runways for snow clearance and designation of management personnel authorised to take the decision; (k) methods of assessing and reporting the surface conditions; and (l) criteria for the suspension of runway operations.
##### AMC1 ADR.OPS.B.035(a) Operations in winter conditions *ED Decision 2021/003/R* **AERODROME SNOW PLAN** The aerodrome snow plan should reflect the exposure of the aerodrome to winter conditions and should include the following: (a) the Snow Committee members and the person in charge of the winter operation, with a chain of command giving a breakdown in duties; (b) methods of communication between aerodrome operations, air traffic services, and the MET provider; (c) the equipment available for snow clearance and surface treatment. This should include equipment for ploughing, sweeping, and blowing snow and application of materials; (d) priority of surfaces to be cleared, and clearance limits for aircraft using the aerodrome; (e) collection of information for RCR and dissemination of this information; (f) designated snow dumping or melting areas; (g) an alerting system in order that sufficient warning is given to all bodies concerned; (h) the manpower available, including staff for equipment maintenance arrangements for shifts, and call-out procedures; (i) deployment of equipment and tactical approaches to be used; (j) general principles to be followed in deciding when to close runways for snow clearance and designation of management personnel authorised to take the decision; (k) methods of assessing and reporting the surface conditions; and (l) criteria for the suspension of runway operations.