Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 ORO.FC.231(i) Evidence-based training
Available versions for ERULES-1963177438-18398
ED Decision 2021/002/R
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Sep 2023)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 ORO.FC.231(i) Evidence-based training ED Decision 2021/002/R PERFORMANCE-BASED CONTINUOUS GROUND TRAINING — INTERNAL AND EXTERNAL EVIDENCE (a) Operator evidence (inner loop) (1) Pilot data (individual or group); (2) Population-based data according to the training metrics determined in the training system performance; (3) Evidence identified or recognised through the safety management process covered in [ORO.GEN.200](#_DxCrossRefBm318085142). (b) External evidence from the authority and manufacturers (external loop) (1) Revision of existing rules and regulations, updated versions of the EBT data report, state safety plan; (2) Training needs derived from updated OSD (if appropriate for ground training), etc. (c) The evidence drives the selection of the methods and tools.
GM1 ORO.FC.231(i) Evidence-based training ED Decision 2021/002/R PERFORMANCE-BASED CONTINUOUS GROUND TRAINING — INTERNAL AND EXTERNAL EVIDENCE (a) Operator evidence (inner loop) (1) Pilot data (individual or group); (2) Population-based data according to the training metrics determined in the training system performance; (3) Evidence identified or recognised through the safety management process covered in [ORO.GEN.200](#_DxCrossRefBm927677504). (b) External evidence from the authority and manufacturers (external loop) (1) Revision of existing rules and regulations, updated versions of the EBT data report, state safety plan; (2) Training needs derived from updated OSD (if appropriate for ground training), etc. (c) The evidence drives the selection of the methods and tools.
##### GM1 ORO.FC.231(i) Evidence-based training *ED Decision 2021/002/R* **PERFORMANCE-BASED CONTINUOUS GROUND TRAINING — INTERNAL AND EXTERNAL EVIDENCE** (a) Operator evidence (inner loop) (1) Pilot data (individual or group); (2) Population-based data according to the training metrics determined in the training system performance; (3) Evidence identified or recognised through the safety management process covered in [ORO.GEN.200](#_DxCrossRefBm523087010). (b) External evidence from the authority and manufacturers (external loop) (1) Revision of existing rules and regulations, updated versions of the EBT data report, state safety plan; (2) Training needs derived from updated OSD (if appropriate for ground training), etc. (c) The evidence drives the selection of the methods and tools.