Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
CS 26.301 Compliance plan for (R)TC holders and applicants
Available versions for ERULES-1963177438-17988
ED Decision 2020/023/R
found in: CS-26 Additional Airworthiness Specifications for Operations (No 2015/640) Part-26 (Mar 2023)
From
CS-26 Additional A... (Oct 2025)
CS-26 Additional A... (Mar 2023)
From section
To
CS-26 Additional A... (Oct 2025)
CS-26 Additional A... (Mar 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
CS 26.301 Compliance plan for (R)TC holders and applicants ED Decision 2020/023/R/R Compliance with point [26.301](#_DxCrossRefBm881534111) of Part-26 is demonstrated when a compliance plan exists that includes the following: (a) a project schedule identifying all the major milestones for meeting the compliance dates as specified in points [26.302](#_DxCrossRefBm881534095) to [26.309](#_DxCrossRefBm881534081) of Part-26, as applicable; (b) a proposed means of compliance with the applicable requirements as specified in points [26.302](#_DxCrossRefBm881534095) to [26.309](#_DxCrossRefBm881534081) of Part-26, including as appropriate, methods and procedures for: (1) performing the damage tolerance evaluation (DTE) of baseline structure, modified structure and published repairs; (2) identifying the aeroplane structural configuration to be evaluated; (3) identifying widespread fatigue damage (WFD)-susceptible structure; (4) identifying the source of engineering data that will be used to perform the required evaluations; (5) performing the WFD evaluation of structure; (6) establishing a limit of validity (LOV) and plans for distribution upon approval (including incorporation of the LOV into the (airworthiness limitation section) ALS); (7) identifying and developing the maintenance actions required to support the LOV; (8) developing a baseline corrosion prevention and control programme (CPCP); (9) establishing a process to ensure the continuing structural integrity programme remains valid; (10) establishing the list of fatigue-critical baseline structures (FCBSs); (11) developing the repair evaluation guidelines (REGs); (c) a plan for submitting a draft of all the required compliance items for review by EASA not less than 60 days before the applicable compliance date. [Issue: 26/3]
#### CS 26.301 Compliance plan for (R)TC holders and applicants *ED Decision 2020/023/R/R* Compliance with point [26.301](#_DxCrossRefBm783605511) of Part-26 is demonstrated when a compliance plan exists that includes the following: (a) a project schedule identifying all the major milestones for meeting the compliance dates as specified in points [26.302](#_DxCrossRefBm783605495) to [26.309](#_DxCrossRefBm783605481) of Part-26, as applicable; (b) a proposed means of compliance with the applicable requirements as specified in points [26.302](#_DxCrossRefBm783605495) to [26.309](#_DxCrossRefBm783605481) of Part-26, including as appropriate, methods and procedures for: (1) performing the damage tolerance evaluation (DTE) of baseline structure, modified structure and published repairs; (2) identifying the aeroplane structural configuration to be evaluated; (3) identifying widespread fatigue damage (WFD)-susceptible structure; (4) identifying the source of engineering data that will be used to perform the required evaluations; (5) performing the WFD evaluation of structure; (6) establishing a limit of validity (LOV) and plans for distribution upon approval (including incorporation of the LOV into the (airworthiness limitation section) ALS); (7) identifying and developing the maintenance actions required to support the LOV; (8) developing a baseline corrosion prevention and control programme (CPCP); (9) establishing a process to ensure the continuing structural integrity programme remains valid; (10) establishing the list of fatigue-critical baseline structures (FCBSs); (11) developing the repair evaluation guidelines (REGs); (c) a plan for submitting a draft of all the required compliance items for review by EASA not less than 60 days before the applicable compliance date. [Issue: 26/3]