Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
1.About this Supporting Material
Available versions for ERULES-1963177438-17824
found in: SKPI (2019/317) Safety Key Performance Indicators (Dec 2020)
Version
SKPI (2019/317) Sa... (Dec 2020)
Section
Share
Version
Show details
Hide details
Version
### 1. About this Supporting Material The purpose of this document is to provide technical material to support compliance with Commission Implementing Regulation (EU) 2019/317[[31]](#_ftn31) (the ‘performance scheme Regulation’) as applicable to RP3 of the SES Performance and Charging Scheme (2020–2024). The European Commission tasked EASA per Article 75(2)(h) of the EASA Basic Regulation (Regulation (EU) 2018/1139)[[32]](#_ftn32): ‘2. For the purposes of ensuring the proper functioning and development of civil aviation in the Union in accordance with the objectives set out in Article 1, the Agency shall: <table border="0" cellpadding="0" cellspacing="0" width="100%"><tr><td valign="top"><p>(h)</p></td><td valign="top"><p>contribute, for matters covered by this Regulation, upon request by the Commission, to the establishment, measurement, reporting and analysis of performance indicators, where Union law establishes performance schemes relating to civil aviation;’</p><p>and </p></td></tr></table> as per Article 93 ‘Implementation of Single European Sky’ ‘The Agency shall, where it has the relevant expertise and upon request, provide technical assistance to the Commission, in the implementation of the Single European Sky, in particular by: <table border="0" cellpadding="0" cellspacing="0" width="100%"><tr><td valign="top"><p>(b)</p></td><td valign="top"><p>contributing, in matters covered by this Regulation, in cooperation with the Performance Review Body provided for in Article 11 of Regulation (EC) No 549/2004, to the implementation of a performance scheme for air navigation services and network functions;’</p></td></tr></table> The European Union Aviation Safety Agency (EASA) developed this material in line with the Basic Regulation and the Rulemaking Procedure[[33]](#_ftn33). This rulemaking activity is included in the latest European Plan for Aviation Safety (EPAS)[[34]](#_ftn34) under rulemaking task (RMT).0723. The text of this material has been developed by EASA based on the input of the RMT.0723 Rulemaking Group (RMG) and adjusted with consideration given to comments received during the public consultation under EASA NPA 2019 -10. The comments received on the NPA and the EASA responses to them have been reflected in a CRD. Subsequent to this tasking, upon advice given to DG MOVE by the European Commission’s Legal Service, the Commission advised EASA not to issue an ED Decision. This finalised supporting technical material has been made available by the Commission Services. It is accessible through the Single European Sky (eusinglesky) portal. --- [[31]](#_ftnref31) Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU) No 391/2013 (OJ L 56, 25.2.2019, p. 1) (<https://eur-lex.europa.eu/legal-content/EN/TXT/?qid=1566568320291&uri=CELEX:32019R0317>). [[33]](#_ftnref33) EASA is bound to follow a structured rulemaking process as required by Article 115(1) of Regulation (EU) 2018/1139. Such a process has been adopted by the EASA Management Board (MB) and is referred to as the ‘Rulemaking Procedure’. See MB Decision No 18‑2015 of 15 December 2015 replacing Decision 01/2012 concerning the procedure to be applied by EASA for the issuing of opinions, certification specifications and guidance material (<http://www.easa.europa.eu/the-agency/management-board/decisions/easa-mb-decision-18-2015-rulemaking-procedure>). [[34]](#_ftnref34)<https://www.easa.europa.eu/document-library/general-publications?publication_type%5B%5D=2467>