Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC2 FPD.OR.105(e) Management system
Available versions for ERULES-1963177438-17558
ED Decision 2020/008/R
found in: ATM/ANS Provision of Services (2017/373) (Feb 2023)
From
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
From section
To
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC2 FPD.OR.105(e) Management system ED Decision 2020/008/R FLIGHT VALIDATION (a) Based on the results from the ground validation as per [AMC1 FPD.OR.105(e)](#_DxCrossRefBm1726556174), the flight validation should: (1) verify that the navigation data to be published is correct; (2) verify that all required infrastructure supports the procedure (e.g. runway markings, lighting, communications and navigation sources); (3) verify the fly-ability of the procedure; and (4) evaluate the draft charting, obstacle and terrain clearances and other operational factors. (b) Flight validation should be required if new navigation aids or minimum obstacle clearance reduction is affected by a change of an existing procedure. (c) For the airways with lower limit equal to or higher than FL145, the flight validation is not required, when the ground validation is completed and satisficed.
AMC2 FPD.OR.105(e) Management system ED Decision 2020/008/R FLIGHT VALIDATION (a) Based on the results from the ground validation as per [AMC1 FPD.OR.105(e)](#_DxCrossRefBm647743359), the flight validation should: (1) verify that the navigation data to be published is correct; (2) verify that all required infrastructure supports the procedure (e.g. runway markings, lighting, communications and navigation sources); (3) verify the fly-ability of the procedure; and (4) evaluate the draft charting, obstacle and terrain clearances and other operational factors. (b) Flight validation should be required if new navigation aids or minimum obstacle clearance reduction is affected by a change of an existing procedure. (c) For the airways with lower limit equal to or higher than FL145, the flight validation is not required, when the ground validation is completed and satisficed.