Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 FPD.OR.100 Flight procedure design (FPD) services
Available versions for ERULES-1963177438-17545
ED Decision 2020/008/R
found in: ATM/ANS Provision of Services (2017/373) (Feb 2023)
From
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
From section
To
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 FPD.OR.100 Flight procedure design (FPD) services ED Decision 2020/008/R GENERAL (a) If the flight procedure(s) or a change thereto result in a change to the functional system of an ATS provider, a safety assessment of the change to the functional system in accordance with [ATS.OR.205](#_DxCrossRefBm1726554911) needs to be carried out by that ATS provider before the deployment of that flight procedure. (b) In other situations, the organisations that perform the safety assessment may vary. For instance, the safety assessment of the a change of flight procedure(s) at an aerodrome may be performed by the aerodrome operator as per ADR.OR.B.040(f) of [Commission Regulation (EU) No 139/2014](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32014R0139&qid=1618921874119) or as per national legislation for aerodromes that are not certified in accordance with [Commission Regulation (EU) No 139/2014](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32014R0139&qid=1618921874119). (c) An approval may not be required, when there are minor changes, including but not limited to: (1) publication of new standard instrument departures (SIDs), as a result of shortening already published SIDs; (2) incorporation in existing standard instrument arrivals (STARs) routes of segments already published in other STARs, with altitudes equal to or higher than those published; (3) change in the procedure approach chart identification: transition planning for change to instrument flight procedure approach chart identification from RNAV to RNP, according to ICAO Circular 353; and (4) removal of segments of SID or STAR to the flight procedures.
GM1 FPD.OR.100 Flight procedure design (FPD) services ED Decision 2020/008/R GENERAL (a) If the flight procedure(s) or a change thereto result in a change to the functional system of an ATS provider, a safety assessment of the change to the functional system in accordance with [ATS.OR.205](#_DxCrossRefBm647742066) needs to be carried out by that ATS provider before the deployment of that flight procedure. (b) In other situations, the organisations that perform the safety assessment may vary. For instance, the safety assessment of the a change of flight procedure(s) at an aerodrome may be performed by the aerodrome operator as per ADR.OR.B.040(f) of [Commission Regulation (EU) No 139/2014](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32014R0139&qid=1618921874119) or as per national legislation for aerodromes that are not certified in accordance with [Commission Regulation (EU) No 139/2014](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32014R0139&qid=1618921874119). (c) An approval may not be required, when there are minor changes, including but not limited to: (1) publication of new standard instrument departures (SIDs), as a result of shortening already published SIDs; (2) incorporation in existing standard instrument arrivals (STARs) routes of segments already published in other STARs, with altitudes equal to or higher than those published; (3) change in the procedure approach chart identification: transition planning for change to instrument flight procedure approach chart identification from RNAV to RNP, according to ICAO Circular 353; and (4) removal of segments of SID or STAR to the flight procedures.