Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC1 AIS.TR.505(b) AIRAC
Available versions for ERULES-1963177438-17541
ED Decision 2020/008/R
found in: ATM/ANS Provision of Services (2017/373) (Feb 2023)
From
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
From section
To
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC1 AIS.TR.505(b) AIRAC ED Decision 2020/008/R MAJOR CHANGES Whenever major changes are planned and where advance notice is desirable and possible, information should be distributed and/or made available by the AIS provider, whenever practicable, so as to reach recipients at least 56 days in advance of the AIRAC effective date. This should apply to the establishment of, and premeditated major changes in the circumstances listed below, as well as to other major changes if deemed necessary: (a) new aerodromes for international instrument flight rules operations; (b) new runways for instrument flight rules (IFR) operations at international aerodromes; (c) design and structure of the ATS route network; (d) design and structure of a set of terminal procedures (including change of procedure bearings due to magnetic variation change); and (e) circumstances listed in AIS.TR.505(a) if the entire State or any significant portion thereof is affected or if cross-border coordination is required.
AMC1 AIS.TR.505(b) AIRAC ED Decision 2020/008/R MAJOR CHANGES Whenever major changes are planned and where advance notice is desirable and possible, information should be distributed and/or made available by the AIS provider, whenever practicable, so as to reach recipients at least 56 days in advance of the AIRAC effective date. This should apply to the establishment of, and premeditated major changes in the circumstances listed below, as well as to other major changes if deemed necessary: (a) new aerodromes for international instrument flight rules operations; (b) new runways for instrument flight rules (IFR) operations at international aerodromes; (c) design and structure of the ATS route network; (d) design and structure of a set of terminal procedures (including change of procedure bearings due to magnetic variation change); and (e) circumstances listed in AIS.TR.505(a) if the entire State or any significant portion thereof is affected or if cross-border coordination is required.