Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 AIS.TR.320(d) Aeronautical information circular (AIC)
Available versions for ERULES-1963177438-17515
ED Decision 2020/008/R
found in: ATM/ANS Provision of Services (2017/373) (Mar 2025)
From
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
From section
To
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 AIS.TR.320(d) Aeronautical information circular (AIC) ED Decision 2020/008/R SNOW PLAN INFORMATION The seasonal AIC on the snow plan may contain information such as that listed below: (a) a list of aerodromes/heliports where during the coming winter the following are expected to be performed: (1) snow clearance in accordance with the runway and taxiway systems; or (2) planned snow clearing, deviating from the runway system (length, width and number of runways, affected taxiways and aprons or portions thereof); (b) information concerning any centre designated to coordinate information on the current state of progress of clearance and on the current state of runways, taxiways and aprons; (c) a division of the aerodromes/heliports into SNOWTAM distribution lists in order to avoid excessive NOTAM distribution; (d) an indication, as necessary, of minor changes to the standing snow plan; (e) a descriptive list of clearance equipment; and (f) a listing of what will be considered as the minimum critical snow bank to be reported at each aerodrome/heliport at which reporting will commence.
GM1 AIS.TR.320(d) Aeronautical information circular (AIC) ED Decision 2020/008/R SNOW PLAN INFORMATION The seasonal AIC on the snow plan may contain information such as that listed below: (a) a list of aerodromes/heliports where during the coming winter the following are expected to be performed: (1) snow clearance in accordance with the runway and taxiway systems; or (2) planned snow clearing, deviating from the runway system (length, width and number of runways, affected taxiways and aprons or portions thereof); (b) information concerning any centre designated to coordinate information on the current state of progress of clearance and on the current state of runways, taxiways and aprons; (c) a division of the aerodromes/heliports into SNOWTAM distribution lists in order to avoid excessive NOTAM distribution; (d) an indication, as necessary, of minor changes to the standing snow plan; (e) a descriptive list of clearance equipment; and (f) a listing of what will be considered as the minimum critical snow bank to be reported at each aerodrome/heliport at which reporting will commence.