Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC4 ATS.TR.255 Operations on parallel or near-parallel runways
Available versions for ERULES-1963177438-17313
ED Decision 2020/008/R
found in: ATM/ANS Provision of Services (2017/373) (Feb 2023)
From
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
From section
To
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC4 ATS.TR.255 Operations on parallel or near-parallel runways ED Decision 2020/008/R REQUIREMENTS AND PROCEDURES FOR SEGREGATED PARALLEL OPERATIONS Segregated parallel operations should only be conducted on parallel runways when the following conditions are met: (a) the runway centre lines are spaced by a minimum of 760 m (2 500 ft) (see Figure 56). Such minimum may be decreased by 30 m for each 150 m that the arrival runway is staggered toward the arriving aircraft, to a minimum of 300 m (see Figure 57), and should be increased by 30 m for each 150 m that the arrival runway is staggered away from the arriving aircraft (see Figure 58); (b) the nominal departure track diverges immediately after take-off by at least 30 degrees from the missed approach track of the adjacent approach (see Figure 56); ![Aviation.Bot AI suggestion, not from EASA source: [Image caption skipped for debugging]](/static/files/file_gqs63YSDadR/image073.png) Figure 56: Segregated parallel operations ![Aviation.Bot AI suggestion, not from EASA source: [Image caption skipped for debugging]](/static/files/file_gqs63YSDadR/image074.png) Figure 57: Segregated parallel operations where runways are staggered ![Aviation.Bot AI suggestion, not from EASA source: [Image caption skipped for debugging]](/static/files/file_gqs63YSDadR/image075.png) Figure 58: Segregated parallel operations where runways are staggered (c) the instrument flight procedure that aligns the aircraft with the extended runway centre line is one of the following: (1) precision approaches and/or APV (RNP AR APCH, RNP APCH); (2) surveillance radar approach (SRA); (3) visual approach; and (d) a suitable ATS surveillance system and the appropriate ground facilities conform to the standard necessary for the specific type of approach in point (c) above.
AMC4 ATS.TR.255 Operations on parallel or near-parallel runways ED Decision 2020/008/R REQUIREMENTS AND PROCEDURES FOR SEGREGATED PARALLEL OPERATIONS Segregated parallel operations should only be conducted on parallel runways when the following conditions are met: (a) the runway centre lines are spaced by a minimum of 760 m (2 500 ft) (see Figure 56). Such minimum may be decreased by 30 m for each 150 m that the arrival runway is staggered toward the arriving aircraft, to a minimum of 300 m (see Figure 57), and should be increased by 30 m for each 150 m that the arrival runway is staggered away from the arriving aircraft (see Figure 58);  (b) the nominal departure track diverges immediately after take-off by at least 30 degrees from the missed approach track of the adjacent approach (see Figure 56); Figure 56: Segregated parallel operations  Figure 57: Segregated parallel operations where runways are staggered  Figure 58: Segregated parallel operations where runways are staggered (c) the instrument flight procedure that aligns the aircraft with the extended runway centre line is one of the following: (1) precision approaches and/or APV (RNP AR APCH, RNP APCH); (2) surveillance radar approach (SRA); (3) visual approach; and (d) a suitable ATS surveillance system and the appropriate ground facilities conform to the standard necessary for the specific type of approach in point (c) above.