Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 to AMC3 ATS.TR.255 Operations on parallel or near-parallel runways
Available versions for ERULES-1963177438-17308
ED Decision 2020/008/R
found in: ATM/ANS Provision of Services (2017/373) (Mar 2025)
From
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
From section
To
ATM/ANS Provision ... (Mar 2025)
ATM/ANS Provision ... (Feb 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 to AMC3 ATS.TR.255 Operations on parallel or near-parallel runways ED Decision 2020/008/R PRECISION APPROACH PROCEDURES With reference to point (e)(1) of [AMC3 ATS.TR.255](#_DxCrossRefBm647742771), the precision approach procedure that aligns the aircraft with the extended runway centre line may include one of the following: ILS, GLS, MLS or SBAS CAT I, when applicable, for the final approach segment.
GM1 to AMC3 ATS.TR.255 Operations on parallel or near-parallel runways ED Decision 2020/008/R PRECISION APPROACH PROCEDURES With reference to point (e)(1) of [AMC3 ATS.TR.255](#_DxCrossRefBm1726555593), the precision approach procedure that aligns the aircraft with the extended runway centre line may include one of the following: ILS, GLS, MLS or SBAS CAT I, when applicable, for the final approach segment.