Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC1 ACNS.C.PBN.245 Path definition and leg transition
Available versions for ERULES-1963177438-16568
ED Decision 2019/011/R
found in: GM Remote Aerodrome Air Traffic Services (ED 2019/004/R) Issue 2 (Jul 2020)
Version
GM Remote Aerodrom... (Jul 2020)
Section
Share
Version
Show details
Hide details
Version
AMC1 ACNS.C.PBN.245 Path definition and leg transition ED Decision 2019/011/R Installation of equipment with an ETSO authorisation against ETSO-C115d satisfies the requirements. Installation of equipment with an ETSO authorisation against ETSO-C146e satisfies the requirements. Installation of equipment with an ETSO authorisation against ETSO-C146c satisfies the requirements of (a), (b)(1), (c) and (d). Subject to EASA’s agreement, where the RNP system does not support the execution of VA, VM, and VI path terminators, the applicant may demonstrate that the aircraft and flight systems allow the flight crew to manually fly the aircraft on a heading to intercept a course or to go direct to another fix after reaching a procedure-specified altitude. The manual execution of VA, VM and VI terminators should be supported by a flight crew workload assessment. Subject to EASA’s agreement, where the RNP system does not support the execution of CA and FM path terminators, the applicant may demonstrate that the RNP system allows the flight crew to readily designate a waypoint and select a desired course to or from a designated waypoint. The manual execution of CA and FM terminators should be supported by a flight crew workload assessment. [References: ED-75D § 3.2.1.2 and ED-75D § 3.2.5.4] [Issue: CS-ACNS/2]