Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC1 ATCO.D.055(b)(6) Unit training plan
Available versions for ERULES-1963177438-14571
ED Decision 2023/011/R
found in: Air Traffic Controllers Licensing and Certification (2015/340) Part-ATCO (Jun 2024)
Version
Air Traffic Contro... (Jun 2024)
Section
Share
Version
Show details
Hide details
Version
AMC1 ATCO.D.055(b)(6) Unit training plan ED Decision 2023/011/R DURATION OF UNIT ENDORSEMENT COURSES (a) The on-the-job training instruction as part of the unit endorsement course should be at least of the duration specified in Annex 1 to the Chicago Convention, Section 4.5.2.2.1(b). (b) The ratings named in Annex 1 to the Chicago Convention, Section 4.5.2.2.1(b), should be read in the context of this Regulation: (1) aerodrome control rating: ADV and ADI ratings; (2) approach control procedural rating: APP rating; (3) approach control surveillance rating: APS rating; (4) area control procedural rating: ACP rating; (5) area control surveillance rating: ACS rating. (c) The approach precision radar control rating in Annex 1 to the Chicago Convention, Section 4.5.2.2.1(b), should be read in the context of this Regulation as APS-PAR rating endorsement according to [ATCO.B.015](#_DxCrossRefBm1379192390). [applicable until 3 August 2024 - ED Decision 2015/010/R] DURATION OF UNIT ENDORSEMENT COURSES (a) The on-the-job training instruction as part of the unit endorsement course should be at least of the duration specified in Annex 1 to the Chicago Convention, Sections 4.5.2.2.1(b) and (c) and 4.5.2.2.3. (b) Notwithstanding point (a), the minimum duration of the on-the-job training instruction for the surveillance radar approach rating endorsement may be partly substituted by utilising a simulator, if approved by the competent authority. (c) The approach precision radar control rating in Annex 1 to the Chicago Convention, Section 4.5.2.2.1(b), should be read in the context of this Regulation as APS-PAR rating endorsement according to point [ATCO.B.015](#_DxCrossRefBm1379192390). (d) The inclusion of surveillance radar approach duties in the privileges of the approach control surveillance rating in Annex 1 to the Chicago Convention, Section 4.5.2.2.1(c), should be read in the context of this Regulation as APS-SRA rating endorsement according to point [ATCO.B.015](#_DxCrossRefBm1379192390). *[applicable from 4 August 2024 - ED Decision 2023/011/R]*