Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC1 NCC.OP.100 Use of aerodromes and operating sites
Available versions for ERULES-1963177438-13475
ED Decision 2013/021/R
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Sep 2023)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC1 NCC.OP.100 Use of aerodromes and operating sites ED Decision 2013/021/R USE OF OPERATING SITES (a) The pilot-in-command should have available from a pre-survey or other publication, for each operating site to be used, diagrams or ground and aerial photographs, depiction (pictorial) and description of: (1) the overall dimensions of the operating site; (2) location and height of relevant obstacles to approach and take-off profiles and in the manoeuvring area; (3) approach and take-off flight paths; (4) surface condition (blowing dust/snow/sand); (5) provision of control of third parties on the ground (if applicable); (6) lighting, if applicable; (7) procedure for activating the operating site in accordance with national regulations, if applicable; (8) other useful information, for example details of the appropriate ATS agency and frequency; and (9) site suitability with reference to available aircraft performance. (b) Where the operator specifically permits operation from sites that are not pre-surveyed, the pilot-in-command should make, from the air, a judgement on the suitability of a site. At least (a)(1) to (a)(6) inclusive and (a)(9) should be considered.
AMC1 NCC.OP.100 Use of aerodromes and operating sites ED Decision 2013/021/R USE OF OPERATING SITES (a) The pilot-in-command should have available from a pre-survey or other publication, for each operating site to be used, diagrams or ground and aerial photographs, depiction (pictorial) and description of: (1) the overall dimensions of the operating site; (2) location and height of relevant obstacles to approach and take-off profiles and in the manoeuvring area; (3) approach and take-off flight paths; (4) surface condition (blowing dust/snow/sand); (5) provision of control of third parties on the ground (if applicable); (6) lighting, if applicable; (7) procedure for activating the operating site in accordance with national regulations, if applicable; (8) other useful information, for example details of the appropriate ATS agency and frequency; and (9) site suitability with reference to available aircraft performance. (b) Where the operator specifically permits operation from sites that are not pre-surveyed, the pilot-in-command should make, from the air, a judgement on the suitability of a site. At least (a)(1) to (a)(6) inclusive and (a)(9) should be considered.
##### AMC1 NCC.OP.100 Use of aerodromes and operating sites *ED Decision 2013/021/R* **USE OF OPERATING SITES** (a) The pilot-in-command should have available from a pre-survey or other publication, for each operating site to be used, diagrams or ground and aerial photographs, depiction (pictorial) and description of: (1) the overall dimensions of the operating site; (2) location and height of relevant obstacles to approach and take-off profiles and in the manoeuvring area; (3) approach and take-off flight paths; (4) surface condition (blowing dust/snow/sand); (5) provision of control of third parties on the ground (if applicable); (6) lighting, if applicable; (7) procedure for activating the operating site in accordance with national regulations, if applicable; (8) other useful information, for example details of the appropriate ATS agency and frequency; and (9) site suitability with reference to available aircraft performance. (b) Where the operator specifically permits operation from sites that are not pre-surveyed, the pilot-in-command should make, from the air, a judgement on the suitability of a site. At least (a)(1) to (a)(6) inclusive and (a)(9) should be considered.