Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 SPA.LVO.105(g) Specific approval criteria
Available versions for ERULES-1963177438-13168
ED Decision 2022/012/R
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Feb 2025)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 SPA.LVO.105(g) Specific approval criteria ED Decision 2022/012/R SPECIFIC APPROVAL CRITERIA — SUCCESSFUL APPROACH AND LANDING (a) The purpose of this GM is to provide operators with supplemental information regarding the criteria for a successful approach and landing. (b) An approach may be considered to be successful if: (1) from 500 ft to start of flare: (i) speed is maintained within +/- 5 kt of the intended speed, disregarding rapid fluctuations due to turbulence; (ii) no relevant system failure occurs; and (2) from 300 ft to DH: (i) no excess deviation occurs; and (ii) no centralised warning gives a missed approach procedure command (if installed). (c) A landing may be considered to be successful if: (1) no relevant system failure occurs; (2) no flare failure occurs; (3) no de-crab failure occurs (if installed); (4) longitudinal touchdown is beyond a point on the runway 150 m after the threshold and before the end of the touchdown zone (TDZ) (750 m from the threshold); (5) lateral touchdown with the outboard landing gear is not outside the TDZ edge; (6) sink rate is not excessive; (7) bank angle does not exceed a bank angle limit; and (8) no roll-out failure or deviation (if installed) occurs. (d) More details can be found in CS AWO.A.ALS.106, CS AWO.B.CATII.113 and AMC AWO.B.CATII.113.
GM1 SPA.LVO.105(g) Specific approval criteria ED Decision 2022/012/R SPECIFIC APPROVAL CRITERIA — SUCCESSFUL APPROACH AND LANDING (a) The purpose of this GM is to provide operators with supplemental information regarding the criteria for a successful approach and landing. (b) An approach may be considered to be successful if: (1) from 500 ft to start of flare: (i) speed is maintained within +/- 5 kt of the intended speed, disregarding rapid fluctuations due to turbulence; (ii) no relevant system failure occurs; and (2) from 300 ft to DH: (i) no excess deviation occurs; and (ii) no centralised warning gives a missed approach procedure command (if installed). (c) A landing may be considered to be successful if: (1) no relevant system failure occurs; (2) no flare failure occurs; (3) no de-crab failure occurs (if installed); (4) longitudinal touchdown is beyond a point on the runway 150 m after the threshold and before the end of the touchdown zone (TDZ) (750 m from the threshold); (5) lateral touchdown with the outboard landing gear is not outside the TDZ edge; (6) sink rate is not excessive; (7) bank angle does not exceed a bank angle limit; and (8) no roll-out failure or deviation (if installed) occurs. (d) More details can be found in CS AWO.A.ALS.106, CS AWO.B.CATII.113 and AMC AWO.B.CATII.113.
##### GM1 SPA.LVO.105(g) Specific approval criteria *ED Decision 2022/012/R* **SPECIFIC APPROVAL CRITERIA — SUCCESSFUL APPROACH AND LANDING** (a) The purpose of this GM is to provide operators with supplemental information regarding the criteria for a successful approach and landing. (b) An approach may be considered to be successful if: (1) from 500 ft to start of flare: (i) speed is maintained within +/- 5 kt of the intended speed, disregarding rapid fluctuations due to turbulence; (ii) no relevant system failure occurs; and (2) from 300 ft to DH: (i) no excess deviation occurs; and (ii) no centralised warning gives a missed approach procedure command (if installed). (c) A landing may be considered to be successful if: (1) no relevant system failure occurs; (2) no flare failure occurs; (3) no de-crab failure occurs (if installed); (4) longitudinal touchdown is beyond a point on the runway 150 m after the threshold and before the end of the touchdown zone (TDZ) (750 m from the threshold); (5) lateral touchdown with the outboard landing gear is not outside the TDZ edge; (6) sink rate is not excessive; (7) bank angle does not exceed a bank angle limit; and (8) no roll-out failure or deviation (if installed) occurs. (d) More details can be found in CS AWO.A.ALS.106, CS AWO.B.CATII.113 and AMC AWO.B.CATII.113.