Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 SPA.RVSM.105(d)(9) RVSM operational approval
Available versions for ERULES-1963177438-13083
ED Decision 2017/009/R
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Sep 2023)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 SPA.RVSM.105(d)(9) RVSM operational approval ED Decision 2017/009/R SPECIFIC REGIONAL PROCEDURES (a) The areas of applicability (by Flight Information Region) of RVSM airspace in identified ICAO regions is contained in the relevant sections of ICAO Document 7030/4. In addition, these sections contain operating and contingency procedures unique to the regional airspace concerned, specific flight planning requirements and the approval requirements for aircraft in the designated region. (b) Comprehensive guidance on operational matters for European RVSM airspace is contained in ICAO EUR Doc 009 entitled ‘Guidance material on the implementation of a 300 m (1 000 ft) vertical separation minimum in the European RVSM airspace’ with further material included in the relevant State aeronautical publications.
GM1 SPA.RVSM.105(d)(9) RVSM operational approval ED Decision 2017/009/R SPECIFIC REGIONAL PROCEDURES (a) The areas of applicability (by Flight Information Region) of RVSM airspace in identified ICAO regions is contained in the relevant sections of ICAO Document 7030/4. In addition, these sections contain operating and contingency procedures unique to the regional airspace concerned, specific flight planning requirements and the approval requirements for aircraft in the designated region. (b) Comprehensive guidance on operational matters for European RVSM airspace is contained in ICAO EUR Doc 009 entitled ‘Guidance material on the implementation of a 300 m (1 000 ft) vertical separation minimum in the European RVSM airspace’ with further material included in the relevant State aeronautical publications.
##### GM1 SPA.RVSM.105(d)(9) RVSM operational approval *ED Decision 2017/009/R* **SPECIFIC REGIONAL PROCEDURES** (a) The areas of applicability (by Flight Information Region) of RVSM airspace in identified ICAO regions is contained in the relevant sections of ICAO Document 7030/4. In addition, these sections contain operating and contingency procedures unique to the regional airspace concerned, specific flight planning requirements and the approval requirements for aircraft in the designated region. (b) Comprehensive guidance on operational matters for European RVSM airspace is contained in ICAO EUR Doc 009 entitled ‘Guidance material on the implementation of a 300 m (1 000 ft) vertical separation minimum in the European RVSM airspace’ with further material included in the relevant State aeronautical publications.
Contact support