Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 SPA.SET-IMC.110(h) Equipment requirements for SET-IMC operations
Available versions for ERULES-1963177438-13029
ED Decision 2017/004/R
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Sep 2023)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 SPA.SET-IMC.110(h) Equipment requirements for SET-IMC operations ED Decision 2017/004/R LANDING LIGHTS In order to demonstrate the compliance of its aeroplaneās landing lights with the 200-ft illumination capability requirement, and in the absence of relevant data available in the aircraft flight manual (AFM), the operator should liaise with the type certificate (TC) holder or supplemental type certificate (STC) holder, as applicable, to obtain a statement of compliance.
GM1 SPA.SET-IMC.110(h) Equipment requirements for SET-IMC operations ED Decision 2017/004/R LANDING LIGHTS In order to demonstrate the compliance of its aeroplaneās landing lights with the 200-ft illumination capability requirement, and in the absence of relevant data available in the aircraft flight manual (AFM), the operator should liaise with the type certificate (TC) holder or supplemental type certificate (STC) holder, as applicable, to obtain a statement of compliance.
##### GM1Ā SPA.SET-IMC.110(h) Equipment requirements for SET-IMC operations *ED Decision 2017/004/R* **LANDING LIGHTS** In order to demonstrate the compliance of its aeroplaneās landing lights with the 200-ft illumination capability requirement, and in the absence of relevant data available in the aircraft flight manual (AFM), the operator should liaise with the type certificate (TC) holder or supplemental type certificate (STC) holder, as applicable, to obtain a statement of compliance.